SB 66: Housing; Counties; Permits; Permitting Agencies; Licensed Professionals; Expedited Permit; Applications; Requirements
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2025-04-24
Current Status:
In Progress
(2025-07-03: Act 295, on 07/03/2025 (Gov. Msg. No. 1398).)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Final Decking
Enacted
Establishes procedures and requirements for single-family and multi-family housing project applicants to apply for an expedited permit, including requirements for completeness of expedited permit applications, duties of licensed professionals and the counties during construction, and applications for owner-builder exemptions. Takes effect 7/1/2026. Sunsets 6/30/2031. (CD1)
Requires permits to be issued by applicable permitting agencies within sixty days of a complete application being filed for single-family and multi-family housing projects if certain conditions are satisfied. Automatically deems approved a permit that is either not otherwise approved by the applicable permitting agency within sixty days or for which the applicant has agreed to all corrections, changes, or recommendations to the plans and specifications made by the applicable permitting agency. Pauses the sixty day permit review period under certain circumstances. Sunsets 6/30/2030. Effective 7/1/3000. (HD3)
Requires permits to be issued by applicable permitting agencies within sixty days of a complete application being filed for certain single-family and multi-family housing projects if certain conditions are satisfied. Automatically deems approved a permit that is either not otherwise approved by the applicable permitting agency within sixty days or for which the applicant has agreed to all changes or recommendations to the plans and specifications made by the applicable permitting agency. Pauses the sixty day permit review period under certain circumstances. Sunsets 6/30/2030. Effective 7/1/3000. (HD2)
Requires permits to be issued by applicable permitting agencies within sixty days of a complete application being filed for certain single-family and multi-family projects if certain conditions are satisfied. Automatically deems approved a permit that is not otherwise approved by the applicable permitting agency within sixty days. Effective 4/23/2057. (HD1)
Requires counties to grant building permits within sixty days if the completed application is stamped and certified by a licensed engineer and architect and other certain conditions are met. Effective 4/23/2057. (SD2)
Requires counties to grant building permits within sixty days if the completed application is stamped and certified by a licensed engineer and architect and other certain conditions are met. (SD1)
Requires counties to grant building permits within 60 days if the application is stamped and certified by a licensed engineer and architect and other certain conditions are met.
|
THE SENATE |
S.B. NO. |
66 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
S.D. 2 |
|
|
STATE OF HAWAII |
H.D. 3 |
|
|
|
C.D. 1 |
|
|
|
||
|
|
||
A BILL FOR AN ACT
RELATING TO HOUSING.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
The legislature further finds that some of the largest obstacles for developers to construct more housing in the State are:
(1) A lack of areas with proper zoning to allow for the construction of residential dwellings;
(2) A lack of infrastructure to support newly developed residential dwellings; and
(3) Delays in the issuance of building permits for single‑family and multi-family projects.
The building permit processing times for single-family and multi-family projects vary tremendously across the United States. However, the counties in Hawaii have some of the longest processing times for residential building permits. An April 2022 study prepared by the university of Hawaii economic research organization found that, on average, Hawaii homebuilders wait three times longer for permits than those in other states, which drives up costs significantly and creates uncertainty, serving as a disincentive to build new projects. Furthermore, the study found that compared to the most regulated markets in the country, Hawaii's permit delays are almost two times longer, meaning it can take from one year to one and a half years for a permit to be approved.
The legislature also finds that lengthy processing times to obtain a building permit raises questions about what information is necessary for counties when processing building permit applications. The basic responsibilities of the counties are to ensure compliance with various building codes and ensure adequate infrastructure capacity to support the proposed project or development. Although it is the counties' responsibility to monitor for compliance with various building codes, if the construction plans do not satisfy these codes and are not corrected before construction, the designer, who is a licensed professional who stamped the plans, and the contractor are ultimately responsible. The counties are also not typically involved in litigation as the building permit process is ministerial, mainly to check for code compliance.
In other municipalities around the country, building plans are not scrutinized to the extent that they are in Hawaii counties. In Hawaii, the plan review is to ensure that the design meets all applicable codes. However, in other municipalities, the plans are used as a guide while code compliance verification is completed upon inspection of the project during construction. Inspectors who find that construction does not satisfy the code either have the correction made in the field or stop construction until proper corrective actions have been taken to ensure that new construction meets the code. Ultimately, the designer and contractor are responsible for ensuring new construction meets all applicable codes.
Accordingly, the purpose of this Act is to establish procedures and requirements for single-family and multi-family homes to apply for an expedited permit until June 30, 2031.
SECTION 2. Chapter 46, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
"§46- Expedited permits; single-family and multi-family housing project permit applications; review time eligibility. (a) Permit applications for single-family and multi-family housing projects in each county shall be eligible for an expedited permit approval pursuant to this section.
(b) An applicant or the applicant's agent may submit a request to the county for an expedited permit if sixty business days have lapsed after the application was considered complete by the relevant agency and the application has not received full approval by the county. The request by the applicant or the applicant's agent shall include:
(1) A full and complete set of plans;
(2) Statements or evidence from the relevant permitting agencies that adequate infrastructure capacity is available to service the project site and specified improvements;
(3) The following information from all licensed professionals on record:
(A) Policies of insurance that:
(i) Name the State and county as additional insurers;
(ii) Are in amounts equivalent to at least $2,000,000; and
(iii) Specifically allow coverage for the completed project for the period under section 657-8; and
(B) A statement that indemnifies and holds harmless the State, its officers, agents, and employees and the county, its officers, agents, and employees;
(4) A statement that sixty business days have lapsed without approval since the application would have been considered complete by the relevant agency; and
(5) The required county contractor's statement.
(c) For the purposes of subsection (b), applications shall only be considered complete if:
(1) Either:
(A) Qualified professionals who meet state historic preservation division rules governing professional qualifications for architecture, archaeology, architectural history, or physical anthropology have made a reasonable and good‑faith determination that the project does not have the potential to affect historic properties, archaeological resources, or burial sites; or
(B) The project has been submitted to the state historic preservation division of the department of land and natural resources and the chapter 6E process has been completed, including for those situations in which the county professional described in subparagraph (A) determines that the project may have the potential to affect historic properties, archaeological resources, or burial sites;
(2) The applicant submits documentation evidencing that the proposed project does not encroach on special flood hazard areas identified as "A" or "V" zones on the Federal Emergency Management Agency's Flood Insurance Rate Maps, or the applicable county official has reviewed the proposed project for floodplain management compliance and has issued a development permit for construction;
(3) The project is not higher than thirty feet;
(4) The project is not situated on a shoreline parcel or a parcel that is impacted by waves, storm waves, high tide, or shoreline erosion and is in compliance with all laws, rules, and procedures pursuant to chapter 205A;
(5) All plans and specifications submitted to a county have been stamped by a duly licensed structural, civil, electrical, or mechanical engineer and licensed professional, as applicable, certifying compliance with the applicable building codes for the respective county; and
(6) Any other administrative criteria that the county deems necessary to carry out the purpose of this section.
If the county determines that the application is not complete, the county shall notify the applicant and specify the information needed to meet the requirements for complete submittal under this subsection.
(d) For applications under section 444-2.5, the owner listed on the application shall instead execute a waiver of all claims against the State and county and execute a statement that indemnifies and holds harmless the State, its officers, agents, and employees and the county, its officers, agents, and employees in lieu of subsection (b)(3). All expedited approval requests by the applicant shall be reviewed for completeness by the county within five days of submittal. For building permits that apply for and meet the criteria for an expedited permit, the county shall execute an agreement with the licensed professional on record as assuming approval and oversight responsibility for the permit application. Upon completion of the agreement, the county shall consider the application approved by the licensed professional, issue an expedited permit, and the applicant may proceed with construction.
(e) After approval, the licensed professional on record or county shall ensure that the project construction is in compliance with the approved plans under the expedited permit, including but not limited to the requirements under chapter 6E and all applicable ordinances regarding land use, set‑back, height, and site development requirements for the project site. State and county inspectors shall not be precluded from entering and inspecting project sites with expedited permits. Licensed professionals and contractors shall address any defects in construction identified by state or county inspectors; provided that the defects in construction are consistent with the specifications in the approved plans. If the defects are not consistent with the approved plans, the licensed professional shall note the disagreement and assume review responsibility as the approving authority or initiate a change to the plans to address the defect. Consistent with the requirements and time periods established by each county, all licensed contractors and the licensed professional or the licensed contractors' or licensed professional's successor agents shall maintain a record of inspected structural, civil, plumbing, and electrical systems after a certificate of occupancy is issued and provide a copy of that record to the applicant and the county.
(f) Upon completion of construction, the licensed professional shall certify in writing to the county that a certificate of occupancy is warranted and all laws, rules, ordinances, and conditions governing permitted construction have been met, along with any necessary as-built drawings consistent with the requirements of each county. The county shall issue the certificate to the applicant and may notate that the certificate is approved by the licensed professional under an agreement pursuant to an expedited permit, and not a county official.
(g) Each county may adopt rules pursuant to chapter 91 to effectuate the purposes of this section and charge any necessary fees, including defining what constitutes the sixty-day period, which may exclude any time spent awaiting substantive responses or revisions from the applicant necessary to address comments issued during the review process.
(h) Nothing in this section shall be construed to allow any violation of federal, state, or county laws, rules, or ordinances. The issuance of a certificate of occupancy shall not be construed to limit or repeal any powers of any county to enforce violations of any law, ordinance, or rule."
SECTION 3. New statutory material is underscored.
SECTION 4. This Act shall take effect on July 1, 2026, and shall be repealed on June 30, 2031.
Report Title:
Housing; Counties; Permits; Permitting Agencies; Licensed Professionals; Expedited Permit; Applications; Requirements
Description:
Establishes procedures and requirements for single-family and multi-family housing project applicants to apply for an expedited permit, including requirements for completeness of expedited permit applications, duties of licensed professionals and the counties during construction, and applications for owner-builder exemptions. Takes effect 7/1/2026. Sunsets 6/30/2031. (CD1)
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
THE SENATE |
S.B. NO. |
66 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
S.D. 2 |
|
|
STATE OF HAWAII |
H.D. 3 |
|
|
|
|
|
|
|
||
|
|
||
A BILL FOR AN ACT
RELATING TO HOUSING.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
The legislature further finds that some of the largest obstacles for developers to construct more housing in the State are:
(1) A lack of areas with proper zoning to allow for the construction of residential dwellings;
(2) A lack of infrastructure to support newly developed residential dwellings; and
(3) Delays in the issuance of building permits for single‑family and multi-family projects.
The building permit processing times for single-family and multi-family projects vary tremendously across the United States. However, the counties in Hawaii seem to have some of the longest processing times for residential building permits. An April 2022 study prepared by the university of Hawaii economic research organization found that, on average, Hawaii homebuilders wait three times longer for permits than those in other states, which drives up costs significantly and creates uncertainty, serving as a disincentive to build new projects. Furthermore, the study found that compared to the most regulated markets in the country, Hawaii's permit delays are almost two times longer, meaning it can take from one year to one and a half years for a permit to be approved.
The legislature also finds that lengthy processing times to obtain a building permit raises the question: What information is necessary for counties when processing building permit applications? The basic responsibilities of the counties are to ensure compliance with various building codes and ensure adequate infrastructure capacity to support the proposed project or development. Although it is the counties' responsibility to monitor for compliance with various building codes, if the construction plans do not satisfy the code and are not corrected before construction, the designer, who is a licensed professional who stamped the plans, and the contractor are ultimately responsible. The counties are also not typically involved in litigation as the building permit process is ministerial, mainly to check for code compliance.
In other municipalities around the country, building plans are not scrutinized to the extent that they are in Hawaii counties. In Hawaii, the plan review is to ensure that the design meets all applicable codes. However, in other municipalities, the plans are used as a guide while code compliance verification is completed upon inspection of the project during construction. Inspectors who find that construction does not satisfy the code either have the correction made in the field or stop construction until proper corrective actions have been taken to ensure that new construction meets the code. Ultimately, the designer and contractor are responsible for ensuring new construction meets all applicable codes.
Accordingly, the purpose of this Act is to require permits to be issued within sixty days for certain single-family and multi-family housing projects if certain conditions are satisfied.
SECTION 2. Chapter 46, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
"§46- Single-family and multi-family housing project permit applications; review time limit. (a) For single-family and multi-family housing projects in each county, a permit shall be issued within sixty days of filing of a complete application, which shall include full and complete plans and a statement from the relevant permitting agency that adequate infrastructure capacity is available to service the project site. During the sixty-day period after the permit application has been filed, the respective county shall ensure that the project is in compliance with chapter 6E and all applicable ordinances regarding land use, set‑back, height, and site development requirements for the project site; provided that noncompliance with any state law or county ordinance may delay the county's issuance of the permit. If the county determines that the application is not complete or if the county requires additional information, corrections, or clarification regarding the permit application, the county shall notify the applicant and specify the information needed to meet the applicable permit requirements and the sixty-day review period shall be paused until a complete application is made to the county. If an applicant does not accept all corrections, changes, or recommendations made by the applicable permitting agency to the plans submitted by the applicant, the sixty-day review period shall be paused until revised full and complete plans are submitted to the applicable permitting agency.
(b) Except as provided in subsection (c), a permit submitted under this section shall be deemed approved if:
(1) The permit has not been approved by the applicable permitting agency within sixty days of filing of a complete application; or
(2) The applicant has submitted a full and complete plan and agrees to all corrections, changes, or recommendations to the plan made by the applicable permitting agency.
(c) A permit that has not been approved by the applicable permitting agency within sixty days of filing a complete application shall not be deemed approved if:
(1) The sixty-day permit review period has been paused to allow the applicant to respond to any additional information, corrections, or clarifications regarding the permit application requested by the applicable permitting agency or to revise any plans in response to any corrections, changes, or recommendations to the plans made by the applicable permitting agency; or
(2) Approval of the permit has been delayed due to noncompliance of the permit with applicable state law or county ordinances.
(d) A county shall not consider an application complete until:
(1) Either:
(A) Qualified county professionals who meet state historic preservation division rules governing professional qualifications for architecture, archaeology, architectural history, or physical anthropology have made a reasonable and good‑faith determination that the project does not have the potential to affect historic properties, archaeological resources, or burial sites; or
(B) The project has been submitted to the state historic preservation division of the department of land and natural resources and the chapter 6E process has been completed, including for those situations in which the county professional described in subparagraph (A) determines that the project may have the potential to affect historic properties, archaeological resources, or burial sites; and
(2) The applicant submits documentation evidencing that the proposed project does not encroach on special flood hazard areas identified as "A" or "V" zones on the Federal Emergency Management Agency's Flood Insurance Rate Maps, or the applicable county official has reviewed the proposed project for floodplain management compliance and has issued a development permit for construction.
(e) Each county may adopt rules pursuant to chapter 91 to effectuate the purposes of this section.
(f) Nothing in this section shall be construed to allow any violation of federal, state, or county laws, rules, or ordinances.
(g) For the purposes of this section, "full and complete plans" means a plan submitted to a county that has been stamped by a duly licensed structural, civil, electrical, or mechanical engineer and architect certifying that all plans and specifications are in compliance with the applicable building codes for the respective county."
SECTION 3. New statutory material is underscored.
SECTION 4. This Act shall take effect on July 1, 3000, and shall be repealed on June 30, 2030.
Report Title:
Housing; Counties; Permits; Permitting Agencies; Review Time Limits; Code Compliance
Description:
Requires permits to be issued by applicable permitting agencies within sixty days of a complete application being filed for single-family and multi-family housing projects if certain conditions are satisfied. Automatically deems approved a permit that is either not otherwise approved by the applicable permitting agency within sixty days or for which the applicant has agreed to all corrections, changes, or recommendations to the plans and specifications made by the applicable permitting agency. Pauses the sixty day permit review period under certain circumstances. Sunsets 6/30/2030. Effective 7/1/3000. (HD3)
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
THE SENATE |
S.B. NO. |
66 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
S.D. 2 |
|
|
STATE OF HAWAII |
H.D. 2 |
|
|
|
|
|
|
|
||
|
|
||
A BILL FOR AN ACT
RELATING TO HOUSING.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
The legislature further finds that some of the largest obstacles for developers to construct more housing in the State are:
(1) A lack of areas with proper zoning to allow for the construction of residential dwellings;
(2) A lack of infrastructure to support newly developed residential dwellings; and
(3) Delays in the issuance of building permits for single‑family and multi-family projects.
The building permit processing times for single-family and multi-family projects vary tremendously across the United States. However, the counties in Hawaii seem to have some of the longest processing times for residential building permits. An April 2022 study prepared by the university of Hawaii economic research organization found that, on average, Hawaii homebuilders wait three times longer for permits than those in other states, which drives up costs significantly and creates uncertainty, serving as a disincentive to build new projects. Furthermore, the study found that compared to the most regulated markets in the country, Hawaii's permit delays are almost two times longer, meaning it can take from one year to one and a half years for a permit to be approved.
The legislature also finds that lengthy processing times to obtain a building permit raises the question: What information is necessary for counties when processing building permit applications? The basic responsibilities of the counties are to ensure compliance with various building codes and ensure adequate infrastructure capacity to support the proposed project or development. Although it is the counties' responsibility to monitor for compliance with various building codes, if the construction plans do not satisfy the code and are not corrected before construction, the designer, who is a licensed professional who stamped the plans, and the contractor are ultimately responsible. The counties are also not typically involved in litigation as the building permit process is ministerial, mainly to check for code compliance.
In other municipalities around the country, building plans are not scrutinized to the extent that they are in Hawaii counties. In Hawaii, the plan review is to ensure that the design meets all applicable codes. However, in other municipalities, the plans are used as a guide while code compliance verification is completed upon inspection of the project during construction. Inspectors who find that construction does not satisfy the code either have the correction made in the field or stop construction until proper corrective actions have been taken to ensure that new construction meets the code. Ultimately, the designer and contractor are responsible for ensuring new construction meets all applicable codes.
Accordingly, the purpose of this Act is to require permits to be issued within sixty days for certain single-family and multi-family housing projects if certain conditions are satisfied.
SECTION 2. Chapter 46, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
"§46- Single-family and multi-family housing project permit applications; review time limit. (a) For single-family and multi-family housing projects in each county, a permit shall be issued within sixty days of filing of a complete application, which shall include full and complete plans and a statement from the relevant permitting agency that adequate infrastructure capacity is available to service the project site. During the sixty-day period after the permit application has been filed, the respective county shall ensure that the project is in compliance with chapter 6E and all applicable ordinances regarding land use, set‑back, height, and site development requirements for the project site; provided that noncompliance with any state or county regulations may delay the county's issuance of the permit. If the county determines that the application is not complete or if the county requires additional information, corrections, or clarification regarding the permit application, the county shall notify the applicant and specify the information needed to meet the applicable permit requirements and the sixty-day review period shall be paused until a complete application is made to the county. If an applicant does not accept all corrections, changes, or recommendations made by the applicable permitting agency to the plans submitted by the applicant, the sixty-day review period shall be paused until revised full and complete plans are submitted to the applicable permitting agency.
(b) Except as provided in subsection (c), a permit submitted under this section shall be deemed approved if:
(1) The permit has not been approved by the applicable permitting agency within sixty days of filing of a complete application; or
(2) The applicant has submitted a full and complete plan and agrees to all corrections, changes, or recommendations to the plan made by the applicable permitting agency.
(c) A permit that has not been approved by the applicable permitting agency within sixty days of filing a complete application shall not be deemed approved if:
(1) The sixty-day permit review period has been paused to allow the applicant to respond to any additional information, corrections, or clarifications regarding the permit application requested by the applicable permitting agency or to revise any plans in response to any corrections, changes, or recommendations to the plans made by the applicable permitting agency; or
(2) Approval of the permit has been delayed due to noncompliance of the permit with applicable state law or county ordinances.
(d) A county shall not consider an application complete until:
(1) Either:
(B) The project has been submitted to the state historic preservation division of the department of land and natural resources and the chapter 6E process has been completed; and
(2) The developer submits documentation evidencing that the proposed development does not encroach on special flood hazard areas identified as "A" or "V" zones on the Federal Emergency Management Agency's Flood Insurance Rate Maps, or the applicable county official has reviewed the proposed development for floodplain management compliance and has issued a development permit for construction.
(e) Each county may adopt rules pursuant to chapter 91 to effectuate the purposes of this section.
(f) Nothing in this section shall be construed to allow any violation of federal, state, or county laws, rules, or ordinances.
(g) For the purposes of this section, "full and complete plans" means a plan submitted to a county that has been stamped by a duly licensed structural, civil, electrical, or mechanical engineer and architect certifying that all plans and specifications are in compliance with the applicable building codes for the respective county."
SECTION 3. New statutory material is underscored.
SECTION 4. This Act shall take effect on July 1, 3000, and shall be repealed on June 30, 2030.
Report Title:
Housing; Counties; Permits; Permitting Agencies; Review Time Limits; Code Compliance
Description:
Requires permits to be issued by applicable permitting agencies within sixty days of a complete application being filed for certain single-family and multi-family housing projects if certain conditions are satisfied. Automatically deems approved a permit that is either not otherwise approved by the applicable permitting agency within sixty days or for which the applicant has agreed to all changes or recommendations to the plans and specifications made by the applicable permitting agency. Pauses the sixty day permit review period under certain circumstances. Sunsets 6/30/2030. Effective 7/1/3000. (HD2)
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
THE SENATE |
S.B. NO. |
66 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
S.D. 2 |
|
|
STATE OF HAWAII |
H.D. 1 |
|
|
|
|
|
|
|
||
|
|
||
A BILL FOR AN ACT
RELATING TO HOUSING.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
The legislature further finds that some of the largest obstacles for developers to construct more housing in the State are:
(1) A lack of areas with proper zoning to allow for the construction of residential dwellings;
(2) A lack of infrastructure to support newly developed residential dwellings; and
(3) Delays in the issuance of building permits for single‑family and multi-family projects.
The building permit processing times for single-family and multi-family projects vary tremendously across the United States. However, the counties in Hawaii seem to have some of the longest processing times for residential building permits. An April 2022 study prepared by the university of Hawaii economic research organization found that, on average, Hawaii homebuilders wait three times longer for permits than those in other states, which drives up costs significantly and creates uncertainty, serving as a disincentive to build new projects. Furthermore, the study found that compared to the most regulated markets in the country, Hawaii's permit delays are almost two times longer, meaning it can take from one year to one and a half years for a permit to be approved.
The legislature also finds that lengthy processing times to obtain a building permit raises the question: What information is necessary for counties when processing building permit applications? The basic responsibilities of the counties are to ensure compliance with various building codes and ensure adequate infrastructure capacity to support the proposed project or development. Although the counties are responsible to monitor for compliance with various building codes, if the construction plans do not satisfy the code and are not corrected before construction, the designer (a licensed professional who stamped the plans) and the contractor are ultimately responsible. A county is also not typically involved in litigation as the building permit process is ministerial, mainly to check for code compliance.
In other municipalities around the country, building plans are not scrutinized to the extent that they are in Hawaii counties. In Hawaii, the plan review is to ensure that the design meets all applicable codes. However, in other municipalities, the plans are used as a guide while code compliance verification is completed upon inspection of the project during construction. Inspectors who find that construction does not satisfy the code either have the correction made in the field or stop construction until proper corrective actions have been taken to ensure that new construction meets the code. Ultimately, the design professional and contractor are responsible to ensure new construction meets all applicable codes.
Accordingly, the purpose of this Act is to require permits to be issued within sixty days for certain single-family and multi-family projects if certain conditions are satisfied.
SECTION 2. Chapter 46, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
"§46- Single-family and multi-family permit applications; review time limit. (a) For single-family and multi-family projects in each county, a permit shall be issued within sixty days of a complete application being filed containing plans and specifications that are in compliance with all relevant codes and standards for the respective county. The completed application shall include a statement from the relevant permitting agency that adequate infrastructure capacity is available to service the project site. During the sixty-day period after the permit application has been submitted, the respective county shall ensure that the project is in compliance with chapter 6E and applicable ordinances regarding land use, set‑back, height, and site development requirements for the project site; provided that noncompliance with any state or county regulations may delay the county's issuance of the permit. If a permit submitted under this section is not approved by the applicable permitting agency within sixty days of a complete application being filed, it shall be deemed approved; provided that approval has not been delayed due to noncompliance of the permit with applicable state law or county ordinances. Nothing in this section shall be construed to allow any violation of federal, state, or county laws, rules, or ordinances.
(b) A county shall not consider an application complete until:
(1) Either:
(B) The project has been submitted to the state historic preservation division of the department of land and natural resources and the chapter 6E process has been completed; and
(2) The developer submits documentation evidencing that the proposed development does not encroach in special flood hazard areas identified as "A" or "V" zones on the Federal Emergency Management Agency's Flood Insurance Rate Maps, or the applicable county official has reviewed the proposed development for floodplain management compliance and has issued a development permit for construction.
(c) Each county may adopt rules pursuant to chapter 91 to effectuate the purposes of this section."
SECTION 3. New statutory material is underscored.
SECTION 4. This Act shall take effect on April 23, 2057.
Report Title:
Housing; Counties; Permits; Permitting Agencies; Review Time Limits; Code Compliance
Description:
Requires permits to be issued by applicable permitting agencies within sixty days of a complete application being filed for certain single-family and multi-family projects if certain conditions are satisfied. Automatically deems approved a permit that is not otherwise approved by the applicable permitting agency within sixty days. Effective 4/23/2057. (HD1)
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
THE SENATE |
S.B. NO. |
66 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
S.D. 2 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
|
|
||
|
|
||
A BILL FOR AN ACT
RELATING TO HOUSING.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
The legislature further finds that some of the largest obstacles for developers to construct more housing in the State are:
(1) A lack of areas having proper zoning for residential dwellings to be constructed;
(2) A lack of infrastructure to support newly developed residential dwellings; and
(3) Delays in the issuance of building permits for single‑family and multi-family projects.
The building permit processing times for single-family and multi-family projects vary tremendously across the United States. However, the counties in Hawaii seem to have some of the longest processing times for residential building permits. An April 2022 study prepared by the university of Hawaii economic research organization found that, on average, Hawaii homebuilders wait three times longer for permits than those in other states, which drives up costs significantly and creates uncertainty, serving as a disincentive to build new projects. Furthermore, the study found that, compared to the most regulated markets in the country, Hawaii's permit delays are almost two times longer, meaning it can take from one year to one and a half years for a permit to be approved.
The lengthy processing times to obtain a building permit begs the question: What information is necessary for counties when processing building permit applications? The basic responsibilities of the county are to ensure compliance with various building codes and ensure adequate infrastructure capacity to support the proposed project or development. Although the counties are responsible to monitor for compliance with various building codes, if the construction plans do not satisfy the code and are not corrected before construction, the designer (a licensed professional who stamped the plans) and the contractor are ultimately responsible. The county is also not typically involved in litigation as the building permit process is ministerial, mainly to check for code compliance.
In other municipalities around the country, building plans are not scrutinized to the extent that they are in Hawaii counties. In Hawaii, the plan review is to ensure that the design meets all applicable codes. However, in other municipalities, the plans are used as a guide while code compliance verification is completed upon inspection of the project during construction. Inspectors who find that construction does not satisfy the code either have the correction made in the field or stop construction until proper corrective actions have been taken to ensure that new construction meets the code. Ultimately, the design professional and contractor are responsible to ensure new construction meets all applicable codes.
Accordingly, the purpose of this Act is to establish a permit process that shifts the responsibility for code compliance from the counties to the design professional for all single-family and multi-family residential projects.
SECTION 2. Chapter 46, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
"§46- Building permit applications; certification; review time limit. (a) For single-family and multi-family projects in each county, a building permit shall be issued within sixty days of a complete application being filed that is stamped by a duly licensed structural, civil, electrical, or mechanical engineer and architect certifying that all plans and specifications are in compliance with the applicable building codes for the respective county. The certification shall include a statement that adequate infrastructure capacity is available to service the project site. During the sixty-day period after the building permit application has been submitted, the respective county shall ensure that the project is in compliance with applicable ordinances regarding land use, set‑back, height, and site development requirements for the project site; provided that noncompliance with any of the county's discretionary approvals may delay the county's issuance of the building permit. If a permit submitted under this section is not approved by the county within sixty days of a complete application being filed, it shall be deemed approved; provided that county approval has not been delayed due to noncompliance of the permit with applicable state law or county ordinances. Nothing in this section shall be construed to allow any violation of federal, state, or county laws or rules.
(b) A county shall not consider an application complete until:
(1) Either:
(B) The project has been submitted to the state historic preservation division of the department of land and natural resources and the chapter 6E process has been completed; and
(2) The developer submits documentation evidencing that the proposed development does not encroach in Special Flood Hazard Areas identified as "A" or "V" zones on the Federal Emergency Management Agency's Flood Insurance Rate Maps, or the applicable county official has reviewed the proposed development for floodplain management compliance and has issued a development permit for construction."
SECTION 3. New statutory material is underscored.
SECTION 4. This Act shall take effect on April 23, 2057.
Report Title:
Housing; Counties; Building Permits; Review Time Limits; Code Compliance
Description:
Requires counties to grant building permits within sixty days if the completed application is stamped and certified by a licensed engineer and architect and other certain conditions are met. Effective 4/23/2057. (SD2)
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
THE SENATE |
S.B. NO. |
66 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
S.D. 1 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
|
|
||
|
|
||
A BILL FOR AN ACT
RELATING TO HOUSING.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
The legislature further finds that some of the largest obstacles for developers to construct more housing in the State are:
(1) A lack of areas having proper zoning for residential dwellings to be constructed;
(2) A lack of infrastructure to support newly developed residential dwellings; and
(3) Delays in the issuance of building permits for single‑family and multi-family projects.
The building permit processing times for single-family and multi-family projects vary tremendously across the United States. However, the counties in Hawaii seem to have some of the longest processing times for residential building permits. An April 2022 study prepared by the university of Hawaii economic research organization found that, on average, Hawaii homebuilders wait three times longer for permits than those in other states, which drives up costs significantly and creates uncertainty, serving as a disincentive to build new projects. Furthermore, the study found that, compared to the most regulated markets in the country, Hawaii's permit delays are almost two times longer, meaning it can take from one year to one and a half years for a permit to be approved.
The lengthy processing times to obtain a building permit begs the question: What information is necessary for counties when processing building permit applications? The basic responsibilities of the county are to ensure compliance with various building codes and ensure adequate infrastructure capacity to support the proposed project or development. Although the counties are responsible to monitor for compliance with various building codes, if the construction plans do not satisfy the code and are not corrected before construction, the designer (a licensed professional who stamped the plans) and the contractor are ultimately responsible. The county is also not typically involved in litigation as the building permit process is ministerial, mainly to check for code compliance.
In other municipalities around the country, building plans are not scrutinized to the extent that they are in Hawaii counties. In Hawaii, the plan review is to ensure that the design meets all applicable codes. However, in other municipalities, the plans are used as a guide while code compliance verification is completed upon inspection of the project during construction. Inspectors who find that construction does not satisfy the code either have the correction made in the field or stop construction until proper corrective actions have been taken to ensure that new construction meets the code. Ultimately, the design professional and contractor are responsible to ensure new construction meets all applicable codes.
Accordingly, the purpose of this Act is to establish a permit process that shifts the responsibility for code compliance from the counties to the design professional for all single-family and multi-family residential projects.
SECTION 2. Chapter 46, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
"§46- Building permit applications; certification; review time limit. (a) For single-family and multi-family projects in each county, a building permit shall be issued within sixty days of a complete application being filed that is stamped by a duly licensed structural, civil, electrical, or mechanical engineer and architect certifying that all plans and specifications are in compliance with the applicable building codes for the respective county. The certification shall include a statement that adequate infrastructure capacity is available to service the project site. During the sixty-day period after the building permit application has been submitted, the respective county shall ensure that the project is in compliance with applicable ordinances regarding land use, set‑back, height, and site development requirements for the project site; provided that noncompliance with any of the county's discretionary approvals may delay the county's issuance of the building permit. If a permit submitted under this section is not approved by the county within sixty days of a complete application being filed, it shall be deemed approved; provided that county approval has not been delayed due to noncompliance of the permit with applicable state law or county ordinances. Nothing in this section shall be construed to allow any violation of federal, state, or county laws or rules.
(b) A county shall not consider an application complete until:
(1) Either:
(B) The project has been submitted to the state historic preservation division of the department of land and natural resources and the chapter 6E process has been completed; and
(2) The developer submits documentation evidencing that the proposed development does not encroach in Special Flood Hazard Areas identified as "A" or "V" zones on the Federal Emergency Management Agency's Flood Insurance Rate Maps, or the applicable county official has reviewed the proposed development for floodplain management compliance and has issued a development permit for construction."
SECTION 3. New statutory material is underscored.
SECTION 4. This Act shall take effect upon its approval.
Report Title:
Housing; Counties; Building Permits; Review Time Limits; Code Compliance
Description:
Requires counties to grant building permits within sixty days if the completed application is stamped and certified by a licensed engineer and architect and other certain conditions are met. (SD1)
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
THE SENATE |
S.B. NO. |
66 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
|
|
|
STATE OF HAWAII |
|
|
|
|
|
|
|
|
||
|
|
||
A BILL FOR AN ACT
RELATING TO HOUSING.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
The legislature further finds that some of the largest obstacles for developers to construct more housing in the State are:
(1) A lack of areas having proper zoning for residential dwellings to be constructed;
(2) A lack of infrastructure to support newly developed residential dwellings; and
(3) Delays in the issuance of building permits for single‑family and multi-family projects.
The building permit processing times for single-family and multi-family projects vary tremendously across the United States. However, the counties in Hawaii seem to have some of the longest processing times for residential building permits. A study prepared by the university of Hawaii economic research office in April 2022 found that, on average, Hawaii homebuilders wait three times longer for permits than those in other states, which drives up costs significantly and creates uncertainty, serving as a disincentive to build new projects. Furthermore, the study found that, compared to the most regulated markets in the country, Hawaii's permit delays are almost two times longer, meaning it can take from one year to one year and a half for a permit to be approved.
The lengthy processing times to obtain a building permit begs the question: What information is necessary for counties when processing building permit applications? The basic responsibilities of the county are to ensure compliance with various building codes and ensure adequate infrastructure capacity to support the proposed project or development. Although the counties are responsible to monitor for compliance with various building codes, if the construction plans do not satisfy the code and are not corrected prior to construction, the designer (a licensed professional who stamped the plans) and the contractor are ultimately responsible. The county is also not typically involved in litigation as the building permit process is ministerial, mainly to check for code compliance.
In other municipalities around the country, building plans are not scrutinized to the extent that they are in Hawaii counties. In Hawaii, the plan review is to ensure that the design meets all applicable codes. However, in other municipalities, the plans are used as a guide while code compliance verification is completed upon inspection of the project during construction. Inspectors who find that construction does not satisfy the code either have the correction made in the field or stop construction until proper corrective actions have been taken to ensure that new construction meets the code. Ultimately, the design professional and contractor are responsible to ensure new construction meets all applicable codes.
Accordingly, the purpose of this Act is to establish a permit process that shifts the responsibility for code compliance from the counties to the design professional for all single-family and multi-family residential projects.
SECTION 2. Chapter 46, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
"§46- Building permit applications; certification; review time limit. (a) For single-family and multi-family projects in each county, a building permit shall be issued within sixty days of an application being filed that is stamped by a duly licensed structural, civil, electrical, or mechanical engineer and architect certifying that all plans and specifications are in compliance with the applicable building codes for the respective county. The certification shall include a statement that adequate infrastructure capacity is available to service the project site. During the sixty-day period after the building permit application has been submitted, the respective county shall ensure that the project is in compliance with applicable ordinances regarding land use, set‑back, height, and site development requirements for the project site; provided that noncompliance with any of the county's discretionary approvals may delay the county's issuance of the building permit. If a permit submitted under this section is not approved by the county within sixty days of a complete application being filed, it shall be deemed approved; provided that county approval has not been delayed due to noncompliance of the permit with applicable state law or county ordinances. Nothing in this section shall be construed to allow any violation of federal, state, or county laws or rules.
(b) A county shall not consider an application complete until:
(1) Either:
(A) The county has made a reasonable and good‑faith determination that the project does not have the potential to affect historic properties, archeological resources, or burial sites; or
(B) The project has been submitted to the state historic preservation division of the department of land and natural resources and the chapter 6E process has been completed; and
(2) The developer submits documentation evidencing that the proposed development does not encroach in Special Flood Hazard Areas identified as "A" or "V" zones on the Federal Emergency Management Agency's Flood Insurance Rate Maps, or the applicable county official has reviewed the proposed development for floodplain management compliance and has issued a development permit for construction."
SECTION 3. New statutory material is underscored.
SECTION 4. This Act shall take effect upon its approval.
|
INTRODUCED BY: |
_____________________________ |
|
|
|
Report Title:
Housing; Counties; Building Permits; Review Time Limits; Code Compliance
Description:
Requires counties to grant building permits within 60 days if the application is stamped and certified by a licensed engineer and architect and other certain conditions are met.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
Date
|
Status
|
|---|---|
| Jul 3, 2025 | Act 295, on 07/03/2025 (Gov. Msg. No. 1398). |
| Jul 3, 2025 | Act 295, 07/03/2025 (Gov. Msg. No. 1398). |
| Jun 6, 2025 | Notice of intent to veto (Gov. Msg. No. 1301) |
| Jun 6, 2025 | Notice of Intent to veto dated 06/06/2025 (Gov. Msg. No. 1301) |
| May 2, 2025 | Enrolled to Governor. |
| May 2, 2025 | Received notice of passage on Final Reading in House (Hse. Com. No. 821). |
| May 1, 2025 | Received notice of Final Reading (Sen. Com. No. 888). |
| Apr 30, 2025 | Passed Final Reading as amended in CD 1 with Representative(s) Amato, Belatti, Poepoe, Shimizu, Souza voting aye with reservations; Representative(s) Iwamoto, Perruso voting no (2) and Representative(s) Cochran excused (1). |
| Apr 30, 2025 | Passed Final Reading, as amended (CD 1). Ayes, 25; Aye(s) with reservations: none. Noes, 0 (none). Excused, 0 (none). |
| Apr 24, 2025 | Forty-eight (48) hours notice Wednesday, 04-30-25. |
| Apr 24, 2025 | Reported from Conference Committee (Conf Com. Rep. No. 78) as amended in (CD 1). |
| Apr 24, 2025 | 48 Hrs. Notice (as amended CD 1) 04-30-25. |
| Apr 24, 2025 | Reported from Conference Committee as amended CD 1 (Conf. Com. Rep. No. 78). |
| Apr 24, 2025 | The Conference Committee recommends that the measure be Passed, with Amendments. The votes were as follows: 5 Ayes: Representative(s) Evslin, Lamosao, Tarnas, Miyake, Pierick; Ayes with reservations: none; 0 Noes: none; and 0 Excused: none. |
| Apr 24, 2025 | The Conference committee recommends that the measure be PASSED, WITH AMENDMENTS. The votes of the Senate Conference Managers were as follows: 2 Aye(s): Senator(s) Chang, Gabbard; Aye(s) with reservations: none ; 0 No(es): none; and 1 Excused: Senator(s) Fevella. |
| Apr 23, 2025 | Conference committee meeting to reconvene on 04-24-25 10:30AM; Conference Room 224. |
| Apr 22, 2025 | Bill scheduled for Conference Committee Meeting on Wednesday, 04-23-25 10:32AM in conference room 224. |
| Apr 22, 2025 | Received notice of appointment of House conferees (Hse. Com. No. 795). |
| Apr 21, 2025 | House Conferees Appointed: Evslin, Lamosao, Tarnas Co-Chairs; Miyake, Pierick. |
| Apr 21, 2025 | Received notice of Senate conferees (Sen. Com. No. 848). |
| Apr 21, 2025 | Senate Conferees Appointed: Chang Chair; Gabbard Co-Chair; Fevella. |
| Apr 8, 2025 | Received notice of disagreement (Sen. Com. No. 774). |
| Apr 8, 2025 | Senate disagrees with House amendments. |
| Apr 8, 2025 | Received from House (Hse. Com. No. 565). |
| Apr 4, 2025 | Passed Third Reading as amended in HD 3 with Representative(s) Grandinetti, Shimizu voting aye with reservations; Representative(s) Belatti, Iwamoto, Perruso, Poepoe voting no (4) and Representative(s) Cochran excused (1). Transmitted to Senate. |
| Apr 2, 2025 | Forty-eight (48) hours notice Friday, 04-04-25. |
| Apr 2, 2025 | Reported from JHA (Stand. Com. Rep. No. 1768) as amended in HD 3, recommending passage on Third Reading. |
| Mar 27, 2025 | The committee on JHA recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 7 Ayes: Representative(s) Tarnas, Poepoe, Hashem, Kahaloa, Takayama, Todd, Garcia; Ayes with reservations: none; 3 Noes: Representative(s) Belatti, Perruso, Shimizu; and 1 Excused: Representative(s) Cochran. |
| Mar 25, 2025 | Bill scheduled to be heard by JHA on Thursday, 03-27-25 2:00PM in House conference room 325 VIA VIDEOCONFERENCE. |
| Mar 21, 2025 | Report adopted; referred to the committee(s) on JHA as amended in HD 2 with Representative(s) Amato voting aye with reservations; none voting no (0) and Representative(s) Cochran, Garrett, Kapela, Kitagawa, Ward excused (5). |
| Mar 21, 2025 | Reported from WAL (Stand. Com. Rep. No. 1488) as amended in HD 2, recommending referral to JHA. |
| Mar 20, 2025 | The committee on WAL recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 9 Ayes: Representative(s) Hashem, Lamosao, Belatti, Ichiyama, Morikawa, Poepoe, Souza; Ayes with reservations: Representative(s) Iwamoto, Shimizu; Noes: none; and 1 Excused: Representative(s) Woodson. |
| Mar 17, 2025 | Bill scheduled to be heard by WAL on Thursday, 03-20-25 9:30AM in House conference room 411 VIA VIDEOCONFERENCE. |
| Mar 14, 2025 | Passed Second Reading as amended in HD 1 and referred to the committee(s) on WAL with none voting aye with reservations; none voting no (0) and Representative(s) Cochran, Holt, Iwamoto, Ward excused (4). |
| Mar 14, 2025 | Reported from HSG (Stand. Com. Rep. No. 1273) as amended in HD 1, recommending passage on Second Reading and referral to WAL. |
| Mar 12, 2025 | The committee on HSG recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 8 Ayes: Representative(s) Evslin, Miyake, Grandinetti, Kila, Kitagawa, La Chica, Muraoka, Pierick; Ayes with reservations: none; Noes: none; and 1 Excused: Representative(s) Cochran. |
| Mar 7, 2025 | Bill scheduled to be heard by HSG on Wednesday, 03-12-25 9:00AM in House conference room 430 VIA VIDEOCONFERENCE. |
| Mar 6, 2025 | Referred to HSG, WAL, JHA, referral sheet 19 |
| Mar 6, 2025 | Pass First Reading |
| Mar 4, 2025 | Received from Senate (Sen. Com. No. 75) in amended form (SD 2). |
| Mar 4, 2025 | Report adopted; Passed Third Reading, as amended (SD 2). Ayes, 25; Aye(s) with reservations: none . Noes, 0 (none). Excused, 0 (none). Transmitted to House. |
| Feb 28, 2025 | 48 Hrs. Notice 03-04-25. |
| Feb 28, 2025 | Reported from JDC (Stand. Com. Rep. No. 991) with recommendation of passage on Third Reading, as amended (SD 2). |
| Feb 19, 2025 | The committee(s) on JDC recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in JDC were as follows: 4 Aye(s): Senator(s) Rhoads, Chang, San Buenaventura, Awa; Aye(s) with reservations: none ; 0 No(es): none; and 1 Excused: Senator(s) Gabbard. |
| Feb 14, 2025 | The committee(s) on JDC will hold a public decision making on 02-19-25 9:45AM; Conference Room 016 & Videoconference. |
| Feb 14, 2025 | Report adopted; Passed Second Reading, as amended (SD 1) and referred to JDC. |
| Feb 14, 2025 | Reported from HOU (Stand. Com. Rep. No. 561) with recommendation of passage on Second Reading, as amended (SD 1) and referral to JDC. |
| Feb 11, 2025 | The committee(s) on HOU recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in HOU were as follows: 5 Aye(s): Senator(s) Chang, Hashimoto, Aquino, Kanuha, Fevella; Aye(s) with reservations: none ; 0 No(es): none; and 0 Excused: none. |
| Feb 7, 2025 | The committee(s) on HOU has scheduled a public hearing on 02-11-25 1:00PM; Conference Room 225 & Videoconference. |
| Feb 7, 2025 | Re-Referred to HOU, JDC. |
| Jan 16, 2025 | Referred to HOU/EIG, JDC. |
| Jan 15, 2025 | Introduced and passed First Reading. |
| Jan 8, 2025 | Pending Introduction. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 30, 2025 | Final Reading | House Floor |
Passed |
|
| Apr 30, 2025 | Final Reading | Senate Floor |
Passed |
|
| Apr 4, 2025 | Third Reading | House Floor |
Passed |
|
| Mar 27, 2025 | The committee on JHA recommend that the measure be PASSED, WITH AMENDMENTS | House Standing Committee on Judiciary & Hawaiian Affairs |
Passed |
|
| Mar 20, 2025 | The committee on WAL recommend that the measure be PASSED, WITH AMENDMENTS | House Standing Committee on Water & Land |
Passed |
|
| Mar 12, 2025 | The committee on HSG recommend that the measure be PASSED, WITH AMENDMENTS | House Standing Committee on Housing |
Passed |
|
| Mar 4, 2025 | Third Reading | Senate Floor |
Passed |
|
| Feb 19, 2025 | The committee(s) on JDC recommend(s) that the measure be PASSED, WITH AMENDMENTS | Senate Standing Committee on Judiciary |
Passed |
|
| Feb 11, 2025 | The committee(s) on HOU recommend(s) that the measure be PASSED, WITH AMENDMENTS | Senate Standing Committee on Housing |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Building Industry Association of Hawaii | ** Support | |
| County of Honolulu and Lāhainā Strong | ** Against | |
| Department of Planning and Permitting of the City | ** Against | |
| Grassroot Institute of Hawaii | ** Support | |
| Hawaii Food Industry Association | ** Support | |
| Hawaii Regional Council of Carpenters | ** Support | |
| Hawaii Association of REALTORS | ** Support | |
| Hawaii YIMBY | ** Support | |
| Lahaina Strong | ** Against | |
| Maui Chamber of Commerce | ** Support | |
| NAIOP Hawaii | ** Support | |
| PACIFIC RESOURCE PARTNERSHIP | ** Support | |
| RMA Sales | ** Support |
CONFERENCE COMMITTEE REP. NO. 78
Honolulu, Hawaii
, 2025
RE: S.B. No. 66
S.D. 2
H.D. 3
C.D. 1
Honorable Ronald D. Kouchi
President of the Senate
Thirty-Third State Legislature
Regular Session of 2025
State of Hawaii
Honorable Nadine K. Nakamura
Speaker, House of Representatives
Thirty-Third State Legislature
Regular Session of 2025
State of Hawaii
Sir and Madam:
Your Committee on Conference on the disagreeing vote of the Senate to the amendments proposed by the House of Representatives in S.B. No. 66, S.D. 2, H.D. 3, entitled:
"A BILL FOR AN ACT RELATING TO HOUSING,"
having met, and after full and free discussion, has agreed to recommend and does recommend to the respective Houses the final passage of this bill in an amended form.
The purpose of this measure is to:
(1) Require permits to be issued by applicable permitting agencies within sixty days of a complete application being filed for single-family and multi-family housing projects if certain conditions are satisfied;
(2) Automatically deem approved a permit that is either not otherwise approved by the applicable permitting agency within sixty days or for which the applicant has agreed to all corrections, changes, or recommendations to the plans and specifications made by the applicable permitting agency;
(3) Pause the sixty-day permit review period under certain circumstances; and
(4) Sunset June 30, 2030.
Your Committee on Conference finds that the State is experiencing a chronic housing shortage that is far outpaced by demand. Presently, county permitting agencies statewide are experiencing significant delays with the approval process, which can increase development costs and postpone the timeline for construction. By establishing an optional expedited permit approval process for single-family and multi-family homes, the State can expeditiously develop housing units that address the ongoing housing shortage while ensuring housing units remain affordable. Therefore, this measure streamlines the permitting process for certain residential housing developments while providing additional housing units for Hawaii's working individuals and families.
Your Committee on Conference has amended this measure by:
(1) Clarifying that permit applications for single-family and multi-family housing projects in each county shall be eligible for an expedited permit approval, rather than requiring permits to be issued within a certain period;
(2) Inserting language that:
(A) Authorizes an applicant or an applicant's agent to submit an optional request to the county for an expedited permit if sixty business days have lapsed after the application was considered complete by the relevant agency and the application has not received full approval by the county;
(B) Requires the optional request to include:
(i) A full and complete set of plans;
(ii) Statements or evidence from the relevant permitting agencies that adequate infrastructure capacity is available;
(iii) Information regarding policies of insurance from all licensed professionals on record specifying certain coverage requirements naming the State and county as insureds, and indemnifying both;
(iv) A statement that sixty business days have lapsed without approval since the application would have been considered complete by the relevant agency; and
(v) The required county contractor's statement;
(C) Establishes the requirements for an application to be considered complete;
(D) Limits eligible projects to those not higher than thirty feet and projects that are not situated on a shoreline parcel or a parcel that is impacted by waves, storm waves, high tide, or other shoreline erosion and requires projects to be in compliance with chapter 205A, Hawaii Revised Statutes;
(E) Requires all plans and specifications submitted to a county to have been stamped by a duly licensed structural, civil, electrical, or mechanical engineer and licensed professional, certifying compliance with the applicable building codes for the respective counties;
(F) Requires any other administrative criteria that the county deems necessary;
(G) If the county determines that the application is not complete, requires each county to notify the applicant and specify the information needed to meet requirements to complete submittal;
(H) Clarifies that, for owner-builder exemptions, the owner shall execute a waiver of all claims against the State and county and execute a statement that indemnifies the State, its officers, agents, and employees and the county, its officers, and agents;
(I) Provides that, for certain building permits that apply for and meet the criteria for an expedited permit, the county shall execute an agreement with the licensed professional on record as assuming approval and oversight responsibility for the permit application, and shall consider the application approved upon approval of the agreement;
(J) Requires the licensed professional on record or county to ensure that the project construction is in compliance with the approved plans under the expedited permit, under certain conditions; and
(K) Requires the licensed professional to certify in writing to the county that a certificate of occupancy is warranted upon completion of construction;
(3) Clarifying that each county may adopt administrative rules pursuant to chapter 91, Hawaii Revised Statutes, to define the sixty-day period, and charge any necessary fees to effectuate the expedited permit approval process;
(4) Clarifying that the issuance of a certificate of occupancy shall not be construed to limit or repeal any powers of any county to enforce violations of any law, ordinance, or rule;
(5) Amending section 1 to reflect its amended purpose;
(6) Changing its effective date to July 1, 2026;
(7) Inserting a sunset date of June 30, 2031; and
(8) Making technical, nonsubstantive amendments for the purposes of clarity and consistency.
As affirmed by the record of votes of the managers of your Committee on Conference that is attached to this report, your Committee on Conference is in accord with the intent and purpose of S.B. No. 66, S.D. 2, H.D. 3, as amended herein, and recommends that it pass Final Reading in the form attached hereto as S.B. No. 66, S.D. 2, H.D. 3, C.D. 1.
Respectfully submitted on behalf of the managers:
|
ON THE PART OF THE HOUSE |
|
ON THE PART OF THE SENATE |
|
____________________________ LUKE A. EVSLIN Co-Chair |
|
____________________________ STANLEY CHANG Chair |
|
____________________________ RACHELE LAMOSAO Co-Chair |
|
____________________________ MIKE GABBARD Co-Chair |
|
____________________________ DAVID A. TARNAS Co-Chair |
|
|
|
|
|
|
STAND. COM. REP. NO. 1768
Honolulu, Hawaii
, 2025
RE: S.B. No. 66
S.D. 2
H.D. 3
Honorable Nadine K. Nakamura
Speaker, House of Representatives
Thirty-Third State Legislature
Regular Session of 2025
State of Hawaii
Madame:
Your Committee on Judiciary & Hawaiian Affairs, to which was referred S.B. No. 66, S.D. 2, H.D. 2, entitled:
"A BILL FOR AN ACT RELATING TO HOUSING,"
begs leave to report as follows:
The purpose of this measure is to:
(1) Require permits to be issued by the applicable permitting agency within sixty days for certain single-family and multi-family housing projects if certain conditions are satisfied;
(2) Automatically deem approved a permit that is either not otherwise approved by the applicable permitting agency within sixty days or for which the applicant has agreed to all changes or recommendations to the plans and specifications made by the applicable permitting agency; and
(3) Pause the sixty day permit review period under certain circumstances.
Your Committee received testimony in support of this measure from the Hawaii Association of REALTORS; Hawaii Food Industry Association; RMA Sales; Grassroot Institute of Hawaii; NAIOP Hawaii; Hawaii YIMBY; and Maui Chamber of Commerce. Your Committee received testimony in opposition to this measure from the Department of Planning and Permitting of the City and County of Honolulu; HI Good Neighbor; Lāhainā Strong; Hawaii's Thousand Friends; and one individual. Your Committee received comments on this measure from the Department of Land and Natural Resources and Office of Hawaiian Affairs.
Your Committee finds that the State's lengthy permitting process results in delays that can significantly increase project costs, create uncertainty, and slow or disincentivize the construction of much needed housing. As time passes, interest rates rise, the costs of material and labor increase, and market factors change, which can render previously viable projects financially unfeasible. This measure therefore addresses delays in the permitting process that can help with the State's housing crisis.
Your Committee has amended this measure by:
(1) Clarifying the situations in which a county shall not consider an application complete; and
(2) Making technical, nonsubstantive amendments for the purposes of clarity, consistency, and style.
As affirmed by the record of votes of the members of your Committee on Judiciary & Hawaiian Affairs that is attached to this report, your Committee is in accord with the intent and purpose of S.B. No. 66, S.D. 2, H.D. 2, as amended herein, and recommends that it pass Third Reading in the form attached hereto as S.B. No. 66, S.D. 2, H.D. 3.
Respectfully submitted on behalf of the members of the Committee on Judiciary & Hawaiian Affairs,
|
|
|
____________________________ DAVID A. TARNAS, Chair |
|
|
|
|
STAND. COM. REP. NO. 1488
Honolulu, Hawaii
, 2025
RE: S.B. No. 66
S.D. 2
H.D. 2
Honorable Nadine K. Nakamura
Speaker, House of Representatives
Thirty-Third State Legislature
Regular Session of 2025
State of Hawaii
Madame:
Your Committee on Water & Land, to which was referred S.B. No. 66, S.D. 2, H.D. 1, entitled:
"A BILL FOR AN ACT RELATING TO HOUSING,"
begs leave to report as follows:
The purpose of this measure is to:
(1) Require permits to be issued by applicable permitting agencies within sixty days of a complete application being filed for certain single-family and multi-family housing projects if certain conditions are satisfied; and
(2) Automatically deem a completed permit approved if the applicable permitting agency has not approved the permit within sixty days, except under certain circumstances.
Your Committee received testimony in support of this measure from the Maui Chamber of Commerce; Hawaii Association of REALTORS; Hawaii Food Industry Association; Hawaii YIMBY; Grassroot Institute of Hawaii; RMA Sales; Pacific Resource Partnership; and one individual. Your Committee received testimony in opposition to this measure from the Department of Planning and Permitting of the City and County of Honolulu; Department of Public Works of the County of Hawaii; and Lāhainā Strong. Your Committee received comments on this measure from the Department of Land and Natural Resources; Office of Hawaiian Affairs; and Hawaii Iron Workers Stabilization Fund.
Your Committee finds that Hawaii's ongoing housing shortage requires immediate action, as a key barrier to meeting the State's housing demand is the prolonged building permit approval process, which significantly delays development, increases costs, and discourages investment in new housing projects. Unlike other jurisdictions where compliance is verified during inspections, Hawaii's extensive pre-construction review process adds unnecessary bottlenecks, hindering efforts to expand residential infrastructure. To address this issue, this measure mandates the issuance of building permits within sixty days for certain single-family and multi-family projects that meet established criteria, ensuring a more efficient permitting process while maintaining compliance with zoning and infrastructure standards.
Your Committee has amended this measure by:
(1) Clarifying that a complete application contains a full and complete plan and inserting a definition for "full and complete plans";
(2) Allowing the sixty-day review period to be paused if the county deems the application is not complete or requires additional information from the applicant, or if the applicant is revising the applicant's submitted plans based on recommendations from the applicable planning agency;
(3) Requiring that a permit be deemed approved if the applicant submits full and complete plans and agrees to all recommendations from the applicable planning agency;
(4) Clarifying when an application shall not be deemed approved if no approval has been granted within sixty days after the application was filed;
(5) Inserting a sunset date of June 30, 2030;
(6) Changing the effective date to July 1, 3000, to encourage further discussion; and
(7) Making technical, nonsubstantive amendments for the purposes of clarity, consistency, and style.
As affirmed by the record of votes of the members of your Committee on Water & Land that is attached to this report, your Committee is in accord with the intent and purpose of S.B. No. 66, S.D. 2, H.D. 1, as amended herein, and recommends that it be referred to your Committee on Judiciary & Hawaiian Affairs in the form attached hereto as S.B. No. 66, S.D. 2, H.D. 2.
Respectfully submitted on behalf of the members of the Committee on Water & Land,
|
|
|
____________________________ MARK J. HASHEM, Chair |
|
|
|
|
STAND. COM. REP. NO. 1273
Honolulu, Hawaii
, 2025
RE: S.B. No. 66
S.D. 2
H.D. 1
Honorable Nadine K. Nakamura
Speaker, House of Representatives
Thirty-Third State Legislature
Regular Session of 2025
State of Hawaii
Madame:
Your Committee on Housing, to which was referred S.B. No. 66, S.D. 2, entitled:
"A BILL FOR AN ACT RELATING TO HOUSING,"
begs leave to report as follows:
Your Committee received testimony in support of this measure from the Hawaii Association of REALTORS; Hawaii Regional Council of Carpenters; NAIOP Hawaii; Maui Chamber of Commerce; Grassroot Institute of Hawaii; Hawaii YIMBY; Building Industry Association of Hawaii; Hawaii Food Industry Association; and two individuals.
Your Committee received testimony in opposition to this measure from the Department of Planning and Permitting of the City and County of Honolulu; Lāhāina Strong; Hawaii's Thousand Friends; Pele Lani Farm LLC; and one individual.
Your Committee received comments on this measure from the Department of Land and Natural Resources; Office of Hawaiian Affairs; County of Hawaii Department of Public Works; and American Institute of Architects, Hawaii State Council, Legislative Advocacy Committee.
Your Committee finds that Hawaii's prolonged building permit approval process significantly hinders housing development and contributes to high costs and delays. Establishing a streamlined permit process that shifts code compliance responsibility to licensed design professionals will reduce bureaucratic obstacles while maintaining safety and regulatory standards. This measure will help expedite the construction of much needed housing and address the State's ongoing housing shortage.
Your Committee has amended this measure by:
(1) Specifying that a permit, rather than only a building permit, for certain single-family or multi-family projects shall be issued within sixty days of the filing of a complete application that contains plans and specifications in compliance with all relevant codes and standards of the respective county and removing the requirement that the application be stamped by an engineer and architect;
(2) Clarifying that the completed application must include a statement from the relevant permitting agency regarding the presence of adequate infrastructure capacity to service the project site;
(3) Requiring the counties to ensure that a project is in compliance with historic preservation requirements;
(4) Clarifying that noncompliance with state or county regulations, rather than a county's discretionary approvals, may delay the county's issuance of a building permit;
(5) Broadening the sixty day automatic approval timeline to include approval by the applicable permitting agency, not just the county;
(6) Authorizing the counties to establish rules; and
(7) Making technical, nonsubstantive amendments for the purposes of clarity, consistency, and style.
As affirmed by the record of votes of the members of your Committee on Housing that is attached to this report, your Committee is in accord with the intent and purpose of S.B. No. 66, S.D. 2, as amended herein, and recommends that it pass Second Reading in the form attached hereto as S.B. No. 66, S.D. 2, H.D. 1, and be referred to your Committee on Water & Land.
Respectfully submitted on behalf of the members of the Committee on Housing,
|
|
|
____________________________ LUKE A. EVSLIN, Chair |
|
|
|
|
STAND. COM. REP. NO. 991
Honolulu, Hawaii
RE: S.B. No. 66
S.D. 2
Honorable Ronald D. Kouchi
President of the Senate
Thirty-Third State Legislature
Regular Session of 2025
State of Hawaii
Sir:
Your Committee on Judiciary, to which was referred S.B. No. 66, S.D. 1, entitled:
"A BILL FOR AN ACT RELATING TO HOUSING,"
begs leave to report as follows:
The purpose and intent of this measure is to require counties to grant building permits within sixty days if the completed application is stamped and certified by a licensed engineer and architect and other certain conditions are met to effectively shift the responsibility for code compliance from the counties to the design professional for all single-family and multi-family residential projects.
Your Committee received testimony in support of this measure from the Grassroot Institute of Hawaii, Hawaii Food Industry Association, Hawaiʻi Association of REALTORS, NAIOP Hawaii, Hawaiʻi YIMBY, Maui Chamber of Commerce, and five individuals.
Your Committee received testimony in opposition to this measure from Lāhainā Strong and one individual.
Your Committee received comments on this measure from the Department of Land and Natural Resources and Office of Hawaiian Affairs.
Your Committee finds that according to the 2024 University of Hawaii Economic Research Organization's factbook, the State's permitting process takes nearly three times longer than in other states, despite efforts by counties to improve efficiency. Your Committee further finds that processing times for single-family home permits on average range from one hundred forty-one days in Hawaii County to three hundred fifteen days in Kauai County, with multifamily housing projects taking even longer. Additionally, the City and County of Honolulu faces a significant backlog, further delaying both residential and commercial projects and thereby raising housing costs in the State. This measure is intended to assist in keeping housing costs lower for the State's residents by expediting building permit review for single family and multifamily projects.
Your Committee has amended this measure by inserting an effective date of April 23, 2057, to encourage further discussion.
As affirmed by the record of votes of the members of your Committee on Judiciary that is attached to this report, your Committee is in accord with the intent and purpose of S.B. No. 66, S.D. 1, as amended herein, and recommends that it pass Third Reading in the form attached hereto as S.B. No. 66, S.D. 2.
Respectfully submitted on behalf of the members of the Committee on Judiciary,
|
|
|
________________________________ KARL RHOADS, Chair |
|
|
|
|
STAND. COM. REP. NO. 561
Honolulu, Hawaii
RE: S.B. No. 66
S.D. 1
Honorable Ronald D. Kouchi
President of the Senate
Thirty-Third State Legislature
Regular Session of 2025
State of Hawaii
Sir:
Your Committee on Housing, to which was referred S.B. No. 66 entitled:
"A BILL FOR AN ACT RELATING TO HOUSING,"
begs leave to report as follows:
The purpose and intent of this measure is to require counties to grant building permits within sixty days if the application is stamped and certified by a licensed engineer and architect and other certain conditions are met.
Your Committee received testimony in support of this measure from the Grassroot Institute of Hawaii, RMA Sales, Hawaiʻi Association of REALTORS, Hawaii Food Industry Association, NAIOP Hawaii, Building Industry Association of Hawaii, Maui Chamber of Commerce, and five individuals.
Your Committee received testimony in opposition to this measure from the Department of Planning and Permitting of the City and County of Honolulu and Lāhainā Strong.
Your Committee received comments on this measure from the Department of Land and Natural Resources and one individual.
Your Committee finds that in recent years, permit approval processes have considerably delayed the construction of many residential and housing development projects. However, the State has a mandate to protect historic properties, burial sites, and other cultural resources that are valuable to the State's history and people. Therefore, this measure streamlines operations with the existing permitting process while acknowledging the State's cultural heritage.
Your Committee has amended this measure by:
(1) Clarifying that a building permit for a single-family and multi-family project shall be issued within sixty days of a complete application;
(3) Making technical, nonsubstantive amendments for the purposes of clarity and consistency.
As affirmed by the record of votes of the members of your Committee on Housing that is attached to this report, your Committee is in accord with the intent and purpose of S.B. No. 66, as amended herein, and recommends that it pass Second Reading in the form attached hereto as S.B. No. 66, S.D. 1, and be referred to your Committee on Judiciary.
Respectfully submitted on behalf of the members of the Committee on Housing,
|
|
|
________________________________ STANLEY CHANG, Chair |
|
|
|
|
Discussed in Hearing
Conference Committee
Conference Committee
Conference Committee
Conference Committee
House Standing Committee on Judiciary & Hawaiian Affairs