SB 179: RELATING TO REMEDIES.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2025-02-13
Current Status:
Failed
(2025-12-08: Carried over to 2026 Regular Session.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Final Decking
Enacted
Clarifies the applicability of the statute of repose for actions arising from construction defects. Clarifies the required contents of a notice of claim of construction defect served on a contractor. Amends the process and time frame for a claimant to accept a contractor's offer to settle or inspect and authorize the contractor to proceed with repairs. Limits the amount a claimant can recover if the claimant rejects a contractor's reasonable proposal for inspection or a reasonable offer to remedy. Clarifies the consequences of rejecting an offer of settlement. Effective 7/1/2050. (SD1)
Clarifies the applicability of the statute of repose for actions arising from construction defects. Clarifies the required contents of a notice of claim of construction defect served on a contractor. Amends the process and time frame for a claimant to accept a contractor's offer to settle or inspect and authorize the contractor to proceed with repairs. Limits the amount a claimant can recover if the claimant rejects a contractor's reasonable proposal for inspection or a reasonable offer to remedy. Clarifies the consequences of rejecting an offer of settlement.
|
THE SENATE |
S.B. NO. |
179 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
S.D. 1 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
|
|
||
|
|
||
A BILL FOR AN ACT
RELATING TO REMEDIES.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The legislature finds that the State is in a major housing crisis, which continues to worsen, and has been exacerbated by the impacts of the 2023 Maui wildfires. Residents of the State face the highest housing costs in the nation and the median single-family home and condominium prices have more than tripled since the 1990s. A substantial contributing factor to the high cost of housing is the cost of anticipated litigation and insurance requirements necessary to protect against future claims, which disincentivizes the construction of homes. Developers or improvers of real property are required to insure against deficiencies of improvements. The proliferation of construction defect litigation results in increased housing prices directly, through passed-on insurance costs, and indirectly, through lower levels of housing supply. This has been exacerbated in recent years with the practice of filing unrestricted constructed defect complaints, which can be filed with no identified defect, and complaints that do not allow a developer or improver of real property to inspect or remedy potential defects. This results in settlements that often do not benefit the homeowner, increases insurance costs, and lowers housing production.
The legislature finds that the existing language in the Contractor Repair Act, codified in chapter 672E, Hawaii Revised Statutes, and the statute of repose, section 657-8, Hawaii Revised Statutes, have failed in their purpose to assist parties in the early resolution of claims and provide a clear framework for resolution of construction defect claims. The lack of clarity has also reduced the effectiveness of these statutes by making it more difficult for all parties to resolve construction defect disputes fairly, resulting in inconsistent rulings and prolonging the dispute-resolution process.
Therefore, the purpose of this Act is to:
(1) Clarify the statute of repose to make it clear that it applies to contract, tort, and statutory claims, fraudulent concealment is not a defense with respect to the repose period, and require a violation of a building code to be material to be actionable;
(2) Clarify the required contents of a notice of claim of a construction defect served on a contractor;
(3) Amend the process and time frame for a claimant to accept a contractor's offer to settle or inspect and authorize the contractor to proceed with repairs;
(4) Limit the amount a claimant can recover if the claimant rejects a contractor's reasonable proposal for inspection or a reasonable offer to remedy; and
(5) Clarify the consequences of rejecting an offer of settlement.
SECTION 2. Section 657-8, Hawaii Revised Statutes, is amended to read as follows:
"§657-8 Limitation of action for
damages based on construction to improve real property. (a) No
action, whether in contract, tort, statute, or otherwise, to recover
damages for any injury to property, real or personal, or for bodily injury or
wrongful death, arising out of any deficiency or neglect in the planning,
design, construction, supervision and administering of construction, and
observation of construction relating to an improvement to real property shall
be commenced more than two years after the cause of action has accrued, but in
any event [not] no more than ten years after the date of
completion of the improvement.
(b)
This section shall not apply to actions for damages against owners or
other persons having an interest in the real property or improvement based on
their negligent conduct in the repair or maintenance of the improvement or to
actions for damages against surveyors for their own errors in boundary
surveys. [The term
"improvement" as used in this section shall have the same meaning as
in section 507-41 and the phrase "date of completion" as used in this
section shall mean the time when there has been substantial completion of the
improvement or the improvement has been abandoned. The filing of an affidavit of publication and
notice of completion with the circuit court where the property is situated in
compliance with section 507-43(f) shall be prima facie evidence of the date of
completion.] An improvement shall
be deemed substantially complete upon the earliest of the following:
(1) The issuance of a temporary certificate of occupancy;
(2) The issuance of a certificate of occupancy; or
(3) The filing of an affidavit of publication and notice of completion within the circuit court where the property is situated in compliance with section 507‑43(f).
If the improvement consists of multiple buildings or improvements, each building or improvement shall be considered as a separate improvement for purposes of determining the limitations period described in this section.
(c) This section shall not be construed to prevent, limit, or extend any shorter period of limitation applicable to sureties provided for in any contract or bond or any other statute, nor to extend or add to the liability of any surety beyond that for which the surety agreed to be liable by contract or bond.
[(c)] (d) Nothing in this section shall exclude or
limit the liability provisions as set forth in the products liability laws.
(e) The doctrine of fraudulent concealment, as used for a defense to statute of limitations, shall not apply to the ten‑year limitations period set forth in subsection (a).
(f) No action, whether in contract, tort, statute, or otherwise, based on a violation of the applicable building code shall be commenced unless the violation is a material violation of the applicable building code.
(g) For the purposes of this section:
"Date of completion" means the time when there has been substantial completion of the improvement or the improvement has been abandoned.
"Improvement" has the same meaning as in section 507-41.
"Material violation" means a building code violation that exists within a completed building, structure, or facility that has resulted in physical harm to a person or significant damage to the performance of a building or its systems; provided that, without limiting the foregoing, it shall not be deemed a "material violation" of an applicable building code if the person or party that is alleged to have violated the building code obtained the required building permits, the local government or public agency with authority to enforce the building code approved the plans, the construction project passes all required inspections under the code, and there is no personal injury or damage to property other than the property that is the subject of the permits, plans, and inspections, unless the person or party knew or should have known that the material violation existed during construction."
SECTION 3. Section 672E-3, Hawaii Revised Statutes, is amended to read as follows:
"[[]§672E-3[]]
Notice of claim of construction defect. (a) A
claimant, no later than ninety days before filing an action against a
contractor, shall serve the contractor with a written notice of claim. The notice of claim shall [describe]:
(1) State that the claimant asserts a claim against the contractor for a construction defect in the design, construction, or remodeling of a dwelling or premises; and
(2) Describe
the claim, with particularity, specificity, and in detail [and
include the results of any testing done.] sufficient to determine the
circumstances constituting the alleged construction defect and damages
resulting from the construction defect.
A general statement that a construction defect may exist shall be
insufficient.
The notice of claim shall not constitute a claim under any applicable insurance policy and shall not give rise to a duty of any insurer to provide a defense under any applicable insurance policy unless and until the process set forth in section 672E‑5 is completed. Nothing in this chapter shall in any way interfere with or alter the rights and obligations of the parties under any liability policy.
(b) If available to the claimant, the claimant shall provide to the contractor, with the notice of claim, actual evidence that depicts the nature and cause of the construction defect and the nature and extent of the repairs necessary to repair the defect, including the following information if obtained by the claimant: expert reports, photographs, videotapes, and any testing performed.
(c) Each individual claimant or class member shall comply with this chapter, which includes permitting inspection under section 672E-4 of each dwelling or premises that is the subject of the claim.
[(b)] (d) A contractor served with a written notice of
claim shall serve any other appropriate subcontractor with notice of the
claim. The contractor's notice shall
include the claimant's written notice of claim.
[(c)] (e) After serving the notice of claim, a claimant
shall give to the contractor reasonable prior notice and an opportunity to
observe if any testing is done."
SECTION 4. Section 672E-4, Hawaii Revised Statutes, is amended to read as follows:
"§672E-4 Rejection of claim; opportunity to repair construction defect. (a) The contractor rejects a claimant's claim of construction defects by:
(1) Serving the claimant with a written rejection of the claim; or
(2) Failing
to respond pursuant to subsection (b)(1) or (b)(2)[,] to the notice of
claim within thirty days after service.
(b) The contractor, within thirty days after service of the notice of claim, shall serve the claimant and any other contractor that has received the notice of claim with a written response to the alleged construction defect that:
(1) Offers to settle without inspecting the construction defect by:
(A) Monetary payment;
(B) Making repairs; or
(C) Both subparagraphs (A) and (B); or
(2) Proposes to inspect the premises of the alleged construction defect that is the subject of the claim.
(c)
Within thirty days following any proposal for inspection under
subsection (b)(2), the claimant shall [provide access to:] accept a
contractor's proposal. After accepting
the contractor's proposal for inspection, the claimant and contractor shall
agree on a time and date for the inspection, which shall occur within thirty
days of the claimant's acceptance of the contractor's proposal for inspection,
unless the claimant and contractor agree to a later date. The claimant shall provide reasonable access to
the dwelling or premises during normal working hours to:
(1) Inspect the premises;
(2) Document any alleged construction defects; and
(3) Perform any testing required to evaluate the nature, extent, and cause of the asserted construction defect, and the nature and extent of any repair or replacement that may be necessary to remedy the asserted construction defect;
provided
that if the claimant is an association under chapter 514B, the claimant shall
have forty-five days to provide [such] access. If access to an individual condominium unit
is necessary, and the association is unable to obtain [such] access,
then the association shall have a reasonable time to provide access. If destructive testing is required, the
contractor shall give advance notice of tests and return the premises to its
pre-testing condition. If inspection or
testing reveals a condition that requires additional testing to fully and
completely evaluate the nature, cause, and extent of the construction defect,
the contractor shall provide notice to the claimant of the need for additional
testing. The claimant shall provide
additional access to the dwelling or premises. If a claim is asserted on behalf of owners of
multiple dwellings, or multiple owners of units within a multi-family complex,
the contractor shall be entitled to inspect each of the dwellings or units.
(d) Within fourteen days following the inspection and testing, the contractor shall serve on the claimant a written:
(1) Offer
to fully or partially remedy the construction defect at no cost to the
claimant. [Such] The offer
shall include a description of construction necessary to remedy the
construction defect and a timetable for the completion of the additional
construction;
(2) Offer to settle the claim by monetary payment;
(3) Offer for a combination of repairs and monetary payment; or
(4) Statement that the contractor will not proceed further to remedy the construction defect.
(e) Any offer of settlement under this section shall reference this section, and shall state that a claimant's failure to respond with a written notice of acceptance or rejection within thirty or forty-five days, whichever applies pursuant to section 672E-5(a), shall mean that the offer is rejected. Failure to serve a written offer or statement under this section shall be deemed a statement that the contractor will not proceed further."
SECTION 5. Section 672E-6, Hawaii Revised Statutes, is amended to read as follows:
"[[]§672E-6[]] Offer
of settlement. (a) Any time after the service of the notice of
claim, any party may serve an offer of settlement.
(b) If the offer is accepted, the parties shall be deemed to have resolved the claim in whole or in part pursuant to the offer.
(c) An offer not accepted within the time
period required under section 672E-5, or ten days after service for any
subsequent offers, shall be deemed withdrawn and evidence thereof is not
admissible except to determine entitlement to recovery of attorneys' fees
and costs[.] and reasonableness of the contractor's offer of
settlement in subsection (d).
(d) If a claimant rejects a contractor's reasonable offer of settlement, the claimant's cost of repair recovery shall be limited to the reasonable value of the repair determined as of the date of the offer and the amount of the offered monetary payment.
(e) If the judgment or award obtained in a
subsequent proceeding is not more favorable than the offer[,] of
settlement, the offeree shall pay the costs incurred by the offeror after
the making of the offer[.] and the offeree shall not be entitled to
recover attorneys' fees and costs incurred after the offer was made. The fact that an offer is made and not
accepted does not preclude a subsequent offer."
SECTION 6. Statutory material to be repealed is bracketed and stricken. New statutory material is underscored.
SECTION 7. This Act shall take effect on July 1, 2050.
Report Title:
Contractor Repair Act; Notice of Claim; Inspection; Repair; Rejection of Claims; Limitations on Recovery; Statute of Repose
Description:
Clarifies the applicability of the statute of repose for actions arising from construction defects. Clarifies the required contents of a notice of claim of construction defect served on a contractor. Amends the process and time frame for a claimant to accept a contractor's offer to settle or inspect and authorize the contractor to proceed with repairs. Limits the amount a claimant can recover if the claimant rejects a contractor's reasonable proposal for inspection or a reasonable offer to remedy. Clarifies the consequences of rejecting an offer of settlement. Effective 7/1/2050. (SD1)
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
THE SENATE |
S.B. NO. |
179 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
|
|
|
STATE OF HAWAII |
|
|
|
|
|
|
|
|
||
|
|
||
A BILL FOR AN ACT
relating to REMEDIES.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The legislature finds that Hawaii is in a major housing crisis, which continues to worsen, and has been further exacerbated by the impacts of the August 2023 Maui wildfires. Residents of Hawaii face the highest housing costs in the nation and the median single-family home and condominium prices have more than tripled since the 1990s. A substantial contributing factor to the high cost of housing is the cost of anticipated litigation and insurance requirements necessary to protect against future claims, which disincentivizes the construction of homes. Developers or improvers of real property are required to insure against deficiencies of improvements. The proliferation of construction defect litigation results in increased housing prices directly, through passed-on insurance costs, and indirectly, through lower levels of housing supply. This has been exacerbated in recent years with the practice of filing unrestricted constructed defect complaints, which can be filed with no identified defect, and complaints that do not allow a developer or improver of real property to inspect or remedy potential defects. This results in settlements that often do not benefit the homeowner, higher insurance costs, and lower housing production.
The legislature finds that the current language contained in the Contractor Repair Act, codified in chapter 672E, Hawaii Revised Statutes, and the statute of repose, section 657-8, Hawaii Revised Statutes, have failed in their purpose to assist the parties in the early resolution of claims and provide a clear framework for resolution of construction defect claims. The lack of clarity has also reduced the effectiveness of these statutes by making it more difficult for all parties to resolve construction defect disputes fairly, resulting in inconsistent rulings and prolonging the dispute-resolution process.
Therefore, the purpose of this Act is to:
(1) Clarify the statute of repose to make it clear that it applies to contract, tort, and statutory claims, fraudulent concealment is not a defense with respect to the repose period, and require a violation of a building code to be material to be actionable;
(2) Clarify the required contents of a notice of claim of construction defect served on a contractor;
(3) Amend the process and time frame for a claimant to accept a contractor's offer to settle or inspect and authorize the contractor to proceed with repairs;
(4) Limit the amount a claimant can recover if the claimant rejects a contractor's reasonable proposal for inspection or a reasonable offer to remedy; and
(5) Clarify the consequences of rejecting an offer of settlement.
SECTION 2. Section 657-8, Hawaii Revised Statutes, is amended to read as follows:
"§657-8 Limitation of action for
damages based on construction to improve real property. (a) No
action, whether in contract, tort, statute, or otherwise, to recover
damages for any injury to property, real or personal, or for bodily injury or
wrongful death, arising out of any deficiency or neglect in the planning,
design, construction, supervision and administering of construction, and
observation of construction relating to an improvement to real property shall
be commenced more than two years after the cause of action has accrued, but in
any event [not] no more than ten years after the date of
completion of the improvement.
(b)
This section shall not apply to actions for damages against owners or
other persons having an interest in the real property or improvement based on
their negligent conduct in the repair or maintenance of the improvement or to
actions for damages against surveyors for their own errors in boundary
surveys. [The term
"improvement" as used in this section shall have the same meaning as
in section 507-41 and the phrase "date of completion" as used in this
section shall mean the time when there has been substantial completion of the
improvement or the improvement has been abandoned. The filing of an affidavit of publication and
notice of completion with the circuit court where the property is situated in
compliance with section 507-43(f) shall be prima facie evidence of the date of
completion.] An improvement shall
be deemed substantially complete upon the earliest of the following:
(1) The issuance of a temporary certificate of occupancy;
(2) The issuance of a certificate of occupancy; or
(3) The filing of an affidavit of publication and notice of completion within the circuit court where the property is situated in compliance with section 507‑43(f).
If the improvement consists of multiple buildings or improvements, each building or improvement shall be considered as a separate improvement for purposes of determining the limitations period set forth in this section.
(c) This section shall not be construed to prevent, limit, or extend any shorter period of limitation applicable to sureties provided for in any contract or bond or any other statute, nor to extend or add to the liability of any surety beyond that for which the surety agreed to be liable by contract or bond.
[(c)] (d) Nothing in this section shall exclude or
limit the liability provisions as set forth in the products liability laws.
(e) The doctrine of fraudulent concealment, as used for a defense to statute of limitations, shall not apply to the ten-year limitations period set forth in subsection (a).
(f) No action, whether in contract, tort, statute, or otherwise, based on a violation of the applicable building code shall be commenced unless the violation is a material violation of the applicable building code.
(g) For purposes of this section:
"Date of completion" means the time when there has been substantial completion of the improvement or the improvement has been abandoned.
"Improvement" has the same meaning as in section 507-41.
"Material violation" means a building code violation that exists within a completed building, structure, or facility that has resulted in physical harm to a person or significant damage to the performance of a building or its systems; provided that, without limiting the foregoing, it shall not be deemed a "material violation" of an applicable building code if the person or party that is alleged to have violated the building code obtained the required building permits, the local government or public agency with authority to enforce the building code approved the plans, the construction project passes all required inspections under the code, and there is no personal injury or damage to property other than the property that is the subject of the permits, plans, and inspections, unless the person or party knew or should have known that the material violation existed during construction."
SECTION 3. Section 672E-3, Hawaii Revised Statutes, is amended to read as follows:
"[[]§672E-3[]]
Notice of claim of construction defect. (a) A
claimant, no later than ninety days before filing an action against a
contractor, shall serve the contractor with a written notice of claim. The notice of claim shall [describe]:
(1) State that the claimant asserts a claim against the contractor for a construction defect in the design, construction, or remodeling of a dwelling or premises; and
(2) Describe
the claim, with particularity, specificity, and in detail [and
include the results of any testing done.] sufficient to determine the
circumstances constituting the alleged construction defect and damages
resulting from the construction defect.
A general statement that a construction defect may exist shall be
insufficient.
The notice of claim shall not constitute a claim under any applicable insurance policy and shall not give rise to a duty of any insurer to provide a defense under any applicable insurance policy unless and until the process set forth in section 672E‑5 is completed. Nothing in this chapter shall in any way interfere with or alter the rights and obligations of the parties under any liability policy.
(b) If available to the claimant, the claimant shall provide to the contractor, with the notice of claim, actual evidence that depicts the nature and cause of the construction defect and the nature and extent of the repairs necessary to repair the defect, including the following information if obtained by the claimant: expert reports, photographs, videotapes, and any testing performed.
(c) Each individual claimant or class member shall comply with this chapter, which includes permitting inspection under section 672E-4 of each dwelling or premises that is the subject of the claim.
[(b)] (d) A contractor served with a written notice of
claim shall serve any other appropriate subcontractor with notice of the
claim. The contractor's notice shall
include the claimant's written notice of claim.
[(c)] (e) After serving the notice of claim, a claimant
shall give to the contractor reasonable prior notice and an opportunity to
observe if any testing is done."
SECTION 4. Section 672E-4, Hawaii Revised Statutes, is amended to read as follows:
"§672E-4 Rejection of claim; opportunity to repair construction defect. (a) The contractor rejects a claimant's claim of construction defects by:
(1) Serving the claimant with a written rejection of the claim; or
(2) Failing
to respond pursuant to subsection (b)(1) or (b)(2)[,] to the notice of
claim within thirty days after service.
(b) The contractor, within thirty days after service of the notice of claim, shall serve the claimant and any other contractor that has received the notice of claim with a written response to the alleged construction defect that:
(1) Offers to settle without inspecting the construction defect by:
(A) Monetary payment;
(B) Making repairs; or
(C) Both subparagraphs (A) and (B); or
(2) Proposes to inspect the premises of the alleged construction defect that is the subject of the claim.
(c)
Within thirty days following any proposal for inspection under
subsection (b)(2), [the claimant shall provide access to:] the claimant
shall accept a contractor's proposal.
After accepting the contractor's proposal for inspection, the claimant
and contractor shall agree on a time and date for the inspection, which shall
occur within thirty days of the claimant's acceptance of the contractor's
proposal for inspection, unless the claimant and contractor agree to a later
date. The claimant shall provide
reasonable access to the dwelling or premises during normal working hours to:
(1) Inspect the premises;
(2) Document any alleged construction defects; and
(3) Perform any testing required to evaluate the nature, extent, and cause of the asserted construction defect, and the nature and extent of any repair or replacement that may be necessary to remedy the asserted construction defect;
provided
that if the claimant is an association under chapter 514B, the claimant shall
have forty-five days to provide [such] access. If access to an individual condominium unit
is necessary, and the association is unable to obtain [such] access,
then the association shall have a reasonable time to provide access. If destructive testing is required, the
contractor shall give advance notice of tests and return the premises to its
pre-testing condition. If inspection or
testing reveals a condition that requires additional testing to fully and
completely evaluate the nature, cause, and extent of the construction defect,
the contractor shall provide notice to the claimant of the need for additional
testing. The claimant shall provide
additional access to the dwelling or premises. If a claim is asserted on behalf of owners of
multiple dwellings, or multiple owners of units within a multi-family complex,
the contractor shall be entitled to inspect each of the dwellings or units.
(d) Within fourteen days following the inspection and testing, the contractor shall serve on the claimant a written:
(1) Offer
to fully or partially remedy the construction defect at no cost to the
claimant. [Such] The offer
shall include a description of construction necessary to remedy the
construction defect and a timetable for the completion of the additional
construction;
(2) Offer to settle the claim by monetary payment;
(3) Offer for a combination of repairs and monetary payment; or
(4) Statement that the contractor will not proceed further to remedy the construction defect.
(e) Any offer of settlement under this section shall reference this section, and shall state that a claimant's failure to respond with a written notice of acceptance or rejection within thirty or forty-five days, whichever applies pursuant to section 672E-5(a), shall mean that the offer is rejected. Failure to serve a written offer or statement under this section shall be deemed a statement that the contractor will not proceed further."
SECTION 5. Section 672E-6, Hawaii Revised Statutes, is amended to read as follows:
"[[]§672E-6[]] Offer
of settlement. (a) Any time after the service of the notice of
claim, any party may serve an offer of settlement.
(b) If the offer is accepted, the parties shall be deemed to have resolved the claim in whole or in part pursuant to the offer.
(c) An offer not accepted within the time
period required under section 672E-5, or ten days after service for any
subsequent offers, shall be deemed withdrawn and evidence thereof is not
admissible except to determine entitlement to recovery of attorneys' fees
and costs[.] and reasonableness of the contractor's offer of
settlement in subsection (d).
(d) If a claimant rejects a contractor's reasonable offer of settlement, the claimant's cost of repair recovery shall be limited to the reasonable value of the repair determined as of the date of the offer and the amount of the offered monetary payment.
(e) If the judgment or award obtained in a
subsequent proceeding is not more favorable than the offer[,] of
settlement, the offeree shall pay the costs incurred by the offeror after
the making of the offer[.] and the offeree shall not be entitled to
recover attorneys' fees and costs incurred after the offer was made. The fact that an offer is made and not
accepted does not preclude a subsequent offer."
SECTION 6. Statutory material to be repealed is bracketed and stricken. New statutory material is underscored.
SECTION 7. This Act shall take effect on July 1, 2025.
|
INTRODUCED BY: |
_____________________________ |
|
|
|
Report Title:
Contractor Repair Act; Notice of Claim; Inspection; Repair; Rejection of Claims; Limitations on Recovery; Statute of Repose
Description:
Clarifies the applicability of the statute of repose for actions arising from construction defects. Clarifies the required contents of a notice of claim of construction defect served on a contractor. Amends the process and time frame for a claimant to accept a contractor's offer to settle or inspect and authorize the contractor to proceed with repairs. Limits the amount a claimant can recover if the claimant rejects a contractor's reasonable proposal for inspection or a reasonable offer to remedy. Clarifies the consequences of rejecting an offer of settlement.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
Date
|
Status
|
|---|---|
| Dec 8, 2025 | Carried over to 2026 Regular Session. |
| Feb 14, 2025 | Report adopted; Passed Second Reading, as amended (SD 1) and referred to JDC. |
| Feb 14, 2025 | Reported from CPN (Stand. Com. Rep. No. 507) with recommendation of passage on Second Reading, as amended (SD 1) and referral to JDC. |
| Feb 10, 2025 | The committee(s) on CPN recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in CPN were as follows: 4 Aye(s): Senator(s) Keohokalole, McKelvey, Richards; Aye(s) with reservations: Senator(s) Fukunaga ; 1 No(es): Senator(s) Awa; and 0 Excused: none. |
| Feb 6, 2025 | The committee(s) on CPN has scheduled a public hearing on 02-10-25 9:35AM; Conference Room 229 & Videoconference. |
| Jan 17, 2025 | Referred to CPN, JDC. |
| Jan 15, 2025 | Introduced and passed First Reading. |
| Jan 13, 2025 | Pending Introduction. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Feb 10, 2025 | The committee(s) on CPN recommend(s) that the measure be PASSED, WITH AMENDMENTS | Senate Standing Committee on Commerce and Consumer Protection |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| A-Plus Seamless Raingutters, Inc. | ** Support | |
| Aliʻi Glass and Metal Inc. | ** Support | |
| Ashford & Wriston, LLLP | ** Support | |
| BIA Hawaii | ** Support | |
| Case Lombardi, ALC | ** Support | |
| D.R. Horton Hawaii | ** Support | |
| Gentry Homes, Ltd. | ** Support | |
| Gray, Hong, Nojima & Associates | ** Support | |
| Haseko Development, Inc. | ** Support | |
| Hawaii Laborers & Employers Cooperation and Education Trust | ** Support | |
| Hawaiʻi Association of REALTORS | ** Support | |
| Hawaiʻi Regional Council of Carpenters | ** Support | |
| Hawaiʻi YIMBY | ** Support | |
| Holomua Collaborative | ** Support | |
| International Union Of Operating Engineers Local 3 | ** Support | |
| Kapolei Chamber of Commerce | ** Support | |
| Kasdan Turner Thomson Booth, LLLC | ** Against | |
| KY International Inc. | ** Support | |
| Laborers' International Union Local 368 | ** Support | |
| Law Offices of Philip S. Nerney, LLLC | ** Against | |
| LippSmith LLP | ** Against | |
| Mutual Housing Association of Hawaiʻi, Inc. | ** Support | |
| Newport Pacific Cabinets, Inc. | ** Support | |
| Ohana Building Supply, Inc. | ** Support | |
| Operative Plasterers' and Cement Masons' International Association Local 630, AFL-CIO | ** Support | |
| Pacific Resource Partnership | ** Support | |
| Paradigm Construction LLC | ** Support | |
| Plumbers & Fitters Local 675 | ** Support | |
| R.M. Towill Corporation | ** Support | |
| Raynor Hawaii Overhead Doors and Gates Inc. | ** Support | |
| Royal Contracting Co., Ltd. | ** Support | |
| Sinclair Drywall, Inc. | ** Support | |
| Stanford Carr Development, LLC | ** Support | |
| TNH Plumbing, Inc. | ** Support | |
| Vinyl Tech and Masonry, Inc. | ** Support | |
| Z Contractors Inc. | ** Support |
STAND. COM. REP. NO. 507
Honolulu, Hawaii
RE: S.B. No. 179
S.D. 1
Honorable Ronald D. Kouchi
President of the Senate
Thirty-Third State Legislature
Regular Session of 2025
State of Hawaii
Sir:
Your Committee on Commerce and Consumer Protection, to which was referred S.B. No. 179 entitled:
"A BILL FOR AN ACT RELATING TO REMEDIES,"
begs leave to report as follows:
The purpose and intent of this measure is to:
(1) Clarify that the Statute of Repose applies to contract, tort, and statutory claims, fraudulent concealment is not a defense with respect to the repose period, and require a violation of a building code to be material to be actionable;
(2) Clarify the required contents of a notice of claim of construction defect served on a contractor;
(3) Amend the process and time frame for a claimant to accept a contractor's offer to settle or inspect and authorize the contractor to proceed with repairs;
(4) Limit the amount a claimant can recover if the claimant rejects a contractor's reasonable proposal for inspection or a reasonable offer to remedy; and
(5) Clarify the consequences of rejecting an offer of settlement.
Your Committee received testimony in support of this measure from the Hawaiʻi Regional Council of Carpenters; Hawaii Laborers & Employers Cooperation and Education Trust; Stanford Carr Development, LLC; Hawaiʻi Association of REALTORS; Haseko Development, Inc.; TNH Plumbing, Inc.; Z Contractors Inc.; Raynor Hawaii Overhead Doors and Gates Inc.; Ohana Building Supply, Inc.; Paradigm Construction LLC; Gray, Hong, Nojima & Associates; Mutual Housing Association of Hawaiʻi, Inc.; Royal Contracting Co., Ltd.; A-Plus Seamless Raingutters, Inc.; Pacific Resource Partnership; International Union of Operating Engineers Local 3; R.M. Towill Corporation; Newport Pacific Cabinets, Inc.; Sinclair Drywall, Inc.; Aliʻi Glass and Metal Inc.; Gentry Homes, Ltd.; Vinyl Tech and Masonry, Inc.; BIA Hawaii; D.R. Horton Hawaii; Ashford & Wriston, LLLP; Case Lombardi, ALC; Operative Plasterers' and Cement Masons' International Association Local 630, AFL-CIO; Hawaiʻi YIMBY; Holomua Collaborative; Laborers' International Union Local 368; Plumbers & Fitters Local 675; Kapolei Chamber of Commerce; KY International Inc.; and numerous individuals.
Your Committee received testimony in opposition to this measure from the Kasdan Turner Thomson Booth, LLLC; Law Offices of Philip S. Nerney, LLLC; LippSmith LLP; and one individual.
Your Committee finds that the Contractor Repair Act was originally designed to encourage a cooperative, good-faith process between builders and homeowners to address legitimate construction defects. However, the existing system has led to excessive legal claims against new developments, resulting in increased construction costs, higher insurance premiums, and more restrictive lending conditions, further adding to the State's housing shortage.
Your Committee finds that the misuse of the Contractor Repair Act has led to an increase in unnecessary litigation that discourages builders from undertaking new housing projects. Residents in the State depend on a stable and thriving construction industry, but when legal threats make development riskier and more expensive, it results in fewer job opportunities and greater economic uncertainty for local carpenters and tradespeople. This measure will help restore balance by ensuring that legitimate construction defects are addressed efficiently and promote fairness and stability in the construction industry. This measure intends to restore a fair dispute resolution process to resolve construction defect claims and promote a more sustainable and affordable housing market in Hawaii.
Your Committee has amended this measure by:
(1) Inserting an effective date of July 1, 2050, to encourage further discussion; and
(2) Making technical, nonsubstantive amendments for the purposes of clarity and consistency.
As affirmed by the record of votes of the members of your Committee on Commerce and Consumer Protection that is attached to this report, your Committee is in accord with the intent and purpose of S.B. No. 179, as amended herein, and recommends that it pass Second Reading in the form attached hereto as S.B. No. 179, S.D. 1, and be referred to your Committee on Judiciary.
Respectfully submitted on behalf of the members of the Committee on Commerce and Consumer Protection,
|
|
|
________________________________ JARRETT KEOHOKALOLE, Chair |
|
|
|
|
Bill Author
Bill Co-Author(s):