SB 1088: RELATING TO ELECTRIC VEHICLE CHARGING INFRASTRUCTURE.
- Session Year: 2025-2026
- House: Senate
- Latest Version Date: 2025-01-17
Current Status:
Failed
(2025-12-08: Carried over to 2026 Regular Session.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Final Decking
Enacted
Provides rebates for the installation of eligible electric vehicle-ready parking stalls for new construction of affordable housing.
|
THE SENATE |
S.B. NO. |
1088 |
|
THIRTY-THIRD LEGISLATURE, 2025 |
|
|
|
STATE OF HAWAII |
|
|
|
|
|
|
|
|
||
|
|
||
A BILL FOR AN ACT
relating to Electric vehicle charging infrastructure.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The legislature finds that while there is growing adoption of electric vehicles among Hawaii residents, the lack of adequate vehicle charging infrastructure presents a barrier to widespread adoption, particularly for residents who are renters or who live in apartment buildings. This barrier creates an equity issue for low-income families who are unable to access the savings and other benefits associated with electric vehicle ownership because they lack access to charging infrastructure.
The legislature further finds that the cost of constructing parking stalls that will accommodate electric vehicle charging systems, also referred to as electric vehicle-ready parking stalls, is approximately one-tenth the cost of retrofitting already-built parking stalls to accommodate electric vehicle charging systems. For market-priced housing, parking stalls are already being constructed to be electric vehicle-ready because of market demand and, in some cases, county requirements. However, parking stalls for affordable housing units are not constructed to be electric vehicle-ready because of the added cost and exemption of affordable housing from electric vehicle-ready county code requirements.
The purpose of this Act is to provide incentives for electric vehicle-ready new construction for affordable housing by providing rebates for the installation of eligible electric vehicle-ready parking stalls for new construction of affordable housing.
SECTION 2. Section 269-72, Hawaii Revised Statutes, is amended to read as follows:
"§269-72
Electric vehicle charging [system;] infrastructure; rebate
program. (a) The public utilities commission, in
consultation with electric vehicle stakeholders and the Hawaii state energy
office, shall administer a rebate program that incentivizes the installation or
upgrade of [an] electric vehicle charging [system,] infrastructure
as provided in this section, and may contract with a third-party administrator
pursuant to section 269-73 to operate and manage the rebate program.
(b) An applicant may be eligible for a rebate under the rebate program if the applicant:
(1) Installs a new electric vehicle charging system where none previously existed to either:
(A) An alternating current Level 2 station with one or more ports that provide electricity to one or more electric vehicles; or
(B) A
direct current fast charging system; [or]
(2) Upgrades an existing electric vehicle charging system to either:
(A) An alternating current Level 2 station with one or more ports that provide electricity to one or more electric vehicles; or
(B) A direct current
fast charging system[.]; or
(3) Installs an electric vehicle-ready parking stall in new construction of affordable housing; provided that fifty per cent of the total number of electric vehicle-ready parking stalls installed in a project shall be eligible for a rebate under this paragraph.
(c) Subject to subsection (f), rebates shall be distributed as follows:
(1) Each eligible installation of an electric vehicle charging system shall receive:
(A) Up to $2,000 for the installation of an alternating current Level 2 station with one port;
(B) Up to $4,500 for the installation of an alternating current Level 2 station with two or more ports; and
(C) Up to $35,000 for the
installation of a direct current fast charging system; [and]
(2) Each eligible upgrade of an electric vehicle charging system shall receive:
(A) Up to $1,300 for the upgrade to an alternating current Level 2 station with one port;
(B) Up to $3,000 for the upgrade to an alternating current Level 2 station with two or more ports; and
(C) Up to $28,000 for the upgrade to a
direct current fast charging system[.]; and
(3) Each eligible installation of an electric vehicle-ready parking stall for new construction of affordable housing shall receive up to $1,750 for the installation of an alternating current Level 2 station.
(d) The public utilities commission shall:
(1) Prepare any forms that may be necessary for an applicant to claim a rebate pursuant to this section; and
(2) Require each applicant to furnish reasonable information to ascertain the validity of the claim, including but not limited to documentation necessary to demonstrate that the installation or upgrade for which the rebate is claimed is eligible.
(e)
This section shall apply to electric vehicle charging systems that are
installed or upgraded after December 31, 2019[.], and electric
vehicle-ready parking stalls that are installed after July 1, 2025.
(f)
Applicants shall submit applications to the public utilities commission
within twelve months of the date that the newly installed or upgraded charging
system is placed into service or the electronic vehicle-ready parking stall
is installed to claim a rebate from the [electric vehicle charging
system] rebate program. Failure to
apply to the commission within twelve months of the date that the newly
installed or upgraded charging system is placed into service or the electric
vehicle-ready parking stall is installed shall constitute a waiver of the
right to claim the rebate. Rebates shall
be subject to available funds, and the program administrator shall not approve
additional rebates for the remainder of the fiscal year after program funds
have been fully exhausted.
(g)
Nothing in this section shall alter taxes due on the original purchase
or upgrade price of an electric vehicle charging system or the
infrastructure for an electric
vehicle-ready parking stall before the application of the
rebate. Any rebate received pursuant to
the electric vehicle charging [system] infrastructure rebate
program shall not be considered income for the purposes of state or county
taxes.
(h)
In administering the electric vehicle charging [system] infrastructure
rebate program, the public utilities commission shall give consideration to the
following guidelines:
(1) Priority should be given to electric vehicle charging systems that are publicly available; serve multiple tenants, employees, or customers; serve electric vehicle fleets; support the visitor industry in transitioning to clean transportation; or serve low-income, moderate-income, or environmental justice communities; and to electric vehicle-ready parking stalls in new construction of affordable housing units;
(2) Electric vehicle charging
[system] infrastructure rebates should enhance broader public
clean energy and grid resiliency goals by supporting deployment of electric vehicle charging
systems that can regulate their time of use, be networked and co-optimized with
other electric vehicle charging
systems, and otherwise provide grid services or other benefits to the utility
and electric grid;
(3) Electric vehicle charging systems that serve a single person, such as a reserved parking stall or a single-family residence, shall not be eligible for rebates;
(4) Electric vehicle
charging [system] infrastructure rebates should support
accessibility of charging to as many electric vehicle drivers as feasible; and
(5) The program administrator may propose new or modified guidelines to be considered in addition to those specified in this subsection and should have the flexibility to make programmatic adjustments due to market changes, technological advancements, and levels of participation to ensure the prudent use of taxpayer funds and to effectively manage the program budget.
(i) Nothing in this section shall prevent an entity from claiming in the same taxable year a rebate under the electric vehicle charging infrastructure rebate program for installation or upgrade of an electric vehicle charging system and installation of an electric vehicle-ready parking stall for new construction of affordable housing.
[(i)] (j) As used in this section:
"Affordable housing" means housing that is affordable to a household with an income at or below one hundred forty per cent of the area median income as determined by the United States Department of Housing and Urban Development.
"Alternating current Level 2 charging station", commonly referred to as "Level 2 charging station", means an electric vehicle charging system that utilizes alternating current electricity providing at least three kilowatts and means a system that:
(1) Is capable of providing electricity from a non-vehicle source to charge the batteries of one or more electric vehicles;
(2) Meets recognized standards and protocols including, but not limited to, Society of Automotive Engineers (SAE) J1772™ of SAE International and Tesla protocol; and
(3) Is designed and installed in compliance with article 625 of the National Electrical Code to appropriate Nationally Recognized Testing Laboratories' standards.
"Applicant" means an individual; non-profit or for-profit corporation; local, state, or federal government agency; homeowner association; or any other eligible entity as defined under rules adopted for the electric vehicle charging system rebate program.
"Direct current fast charging system", commonly referred to as "DC fast charging system", means an electric vehicle charging system that utilizes direct current electricity providing forty kilowatts or greater and:
(2) Meets recognized standards and protocols, including, but not limited to, Society of Automotive Engineers (SAE) J1772™ of SAE International, Tesla protocol, and CHAdeMO protocol; and
(3) Is designed and installed in compliance with article 625 of the National Electrical Code to appropriate Nationally Recognized Testing Laboratories' standards.
"Electric vehicle charging system" has the same meaning as Electric Vehicle Supply Equipment as defined in article 625.2 of the National Electrical Code, as amended.
"Electric vehicle-ready" means having a full-circuit installation that includes two hundred eight volt three phase or two hundred forty volt single phase power, forty-ampere panel capacity, raceway, wiring, receptacle, and overprotection devices similar to a dryer circuit."
SECTION 3. Sections 243-3.5(a), 269-33(e), and 269-73, Hawaii Revised Statutes, are amended by substituting the phrase "electric vehicle charging infrastructure", or similar term, wherever the phrase "electric vehicle charging system" appears, as the context requires.
SECTION 4. Statutory material to be repealed is bracketed and stricken. New statutory material is underscored.
SECTION 5. This Act shall take effect on July 1, 2025.
|
INTRODUCED BY: |
_____________________________ |
|
|
|
Report Title:
Electric Vehicle Charging Infrastructure; Electric Vehicle-ready Parking Stalls; Affordable Housing; Rebates; HHFDC
Description:
Provides rebates for the installation of eligible electric vehicle-ready parking stalls for new construction of affordable housing.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
|
Date
|
Status
|
|---|---|
| Dec 8, 2025 | Carried over to 2026 Regular Session. |
| Feb 14, 2025 | Report adopted; Passed Second Reading and referred to WAM. |
| Feb 14, 2025 | Reported from EIG/TCA (Stand. Com. Rep. No. 540) with recommendation of passage on Second Reading and referral to WAM. |
| Feb 11, 2025 | The committee(s) on TCA recommend(s) that the measure be PASSED, UNAMENDED. The votes in TCA were as follows: 4 Aye(s): Senator(s) Lee, C., Elefante, Kanuha, DeCorte; Aye(s) with reservations: none ; 0 No(es): none; and 1 Excused: Senator(s) Inouye. |
| Feb 11, 2025 | The committee(s) on EIG recommend(s) that the measure be PASSED, UNAMENDED. The votes in EIG were as follows: 4 Aye(s): Senator(s) Wakai, Chang, DeCoite, Richards; Aye(s) with reservations: none ; 0 No(es): none; and 1 Excused: Senator(s) Fevella. |
| Feb 5, 2025 | The committee(s) on EIG/TCA has scheduled a public hearing on 02-11-25 3:00PM; Conference Room 224 & Videoconference. |
| Jan 23, 2025 | Referred to EIG/TCA, WAM. |
| Jan 21, 2025 | Passed First Reading. |
| Jan 17, 2025 | Introduced. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Feb 11, 2025 | The committee(s) on TCA recommend(s) that the measure be PASSED, UNAMENDED | Senate Standing Committee on Transportation and Culture and the Arts |
Passed |
|
| Feb 11, 2025 | The committee(s) on EIG recommend(s) that the measure be PASSED, UNAMENDED | Senate Standing Committee on Energy and Intergovernmental Affairs |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350Hawaii.org | ** Support | |
| Alliance For Automotive Innovation | ** Support | |
| Coalition Earth | ** Support | |
| County of Kaua‘i, Office of Economic Development | *** Support | Feb 11, 2025 |
| Hawaii Electric Vehicle Association | ** Support | |
| Hawaii Electric Vehicle Association | *** Support | Feb 11, 2025 |
| Hawaii State Energy Office | ** Support | |
| Hawaiian Electric | ** Support | |
| Hawaiʻi Energy | ** Support | |
| Office of Economic Development of the County of Kauaʻi | ** Support | |
| Office of Climate Change, Sustainability, and Resiliency of the City and County of Honolulu | ** Support | |
| Public Utilities Commission | ** Support | |
| Ulupono Initiative | ** Support |
STAND. COM. REP. NO. 540
Honolulu, Hawaii
RE: S.B. No. 1088
Honorable Ronald D. Kouchi
President of the Senate
Thirty-Third State Legislature
Regular Session of 2025
State of Hawaii
Sir:
Your Committees on Energy and Intergovernmental Affairs and Transportation and Culture and the Arts, to which was referred S.B. No. 1088 entitled:
"A BILL FOR AN ACT RELATING TO ELECTRIC VEHICLE CHARGING INFRASTRUCTURE,"
beg leave to report as follows:
The purpose and intent of this measure is to provide rebates for the installation of eligible electric vehicle-ready parking stalls for new construction of affordable housing.
Your Committees received testimony in support of this measure from the Public Utilities Commission; Hawaii State Energy Office; Office of Climate Change, Sustainability, and Resiliency of the City and County of Honolulu; Office of Economic Development of the County of Kauaʻi; Hawaiian Electric; Ulupono Initiative; 350Hawaii.org; Hawaii Electric Vehicle Association; Coalition Earth; Hawaiʻi Energy; Alliance for Automotive Innovation; and one individual.
Your Committees find that the State's decarbonization and emissions-reduction goals necessitate the rapid transition to zero-emission vehicles that utilize local, renewable energy sources. Your Committees also find that while there is growing adoption of electric vehicles among Hawaii residents, the lack of adequate vehicle charging infrastructure presents a barrier to widespread adoption, particularly for low-income families who are unable to access the savings and other benefits associated with electric vehicle ownership. Additionally, parking stalls for affordable housing units are not constructed to be electric vehicle-ready because of the added cost and certain exemptions. This measure provides incentives for electric vehicle-ready new construction for affordable housing, offering more equitable participation in the net-negative carbon economy and further assisting the State in meeting its decarbonization goals and other emissions-reduction commitments.
As affirmed by the records of votes of the members of your Committees on Energy and Intergovernmental Affairs and Transportation and Culture and the Arts that are attached to this report, your Committees are in accord with the intent and purpose of S.B. No. 1088 and recommend that it pass Second Reading and be referred to your Committee on Ways and Means.
Respectfully submitted on behalf of the members of the Committees on Energy and Intergovernmental Affairs and Transportation and Culture and the Arts,
|
________________________________ CHRIS LEE, Chair |
|
________________________________ GLENN WAKAI, Chair |
|
|
|
|
|
Date
|
Testimony PDF
|
|---|---|
| Feb 11, 2025 | SB1088_TESTIMONY_TCA-EIG_02-11-25_.PDF |
Discussed in Hearing
Senate Standing Committee on Transportation and Culture and the Arts
Senate Standing Committee on Energy and Intergovernmental Affairs
Bill Author
Bill Co-Author(s):